An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wendover Renovation Presentation 2011-2012

  2. Renovation Stages • Before • Now • After • How you will be affected • Questions/Concerns Presentation Overview

  3. This school was built in 1970 as a temporary school and was designed to last only twenty years. • So, in 1990 it should have been demolished and rebuilt. • But now, in 2012, it is being renovated. Story Behind this School

  4. Let’s get on to the stages…

  5. Front Side of Wendover Renovation Stages - Before Boarded Windows Water Damage

  6. No Central Air Conditioning • Over the years, there has been a couple air conditioners added on to the building that mostly cool down rooms that don’t have windows. Renovation Stages - Before

  7. Other parts of the building that are damaged. Renovation Stages - Before

  8. Renovation Stages - Before

  9. Renovation Stages - Before

  10. Renovation Stages – Before

  11. These pictures show a general idea of what is going on now. The ceiling tiles were removed during Christmas break. Since they are gone, it will be slightly colder in the hallways. Renovation Stages - Now

  12. During the time period of the renovation, the equipment and trailers are going to be stored on the football field. It is still to be decided whether or not the football teams will be consolidated into one team next year. Renovation Stages - Now

  13. Overview

  14. PHASE 1 – *Cafeteria* and Band Room (December 2011 – August 2012) Renovation Stages - Now

  15. PHASE 1 – *Cafeteria* and Band Room (December 2011 – August 2012) Renovation Stages - Now

  16. Renovation Stages - After

  17. PHASE 1 – Cafeteria and *Band Room* (December 2011 – August 2012) Renovation Stages - Now

  18. PHASE 1 – Cafeteria and *Band Room* (December 2011 – August 2012) Renovation Stages - Now

  19. Along with the cafeteria and the band room, there will be a server room where the old instrument storage room used to be. Also there will be an electrical room where the old weight room used to be. Renovation Stages - After

  20. PHASE 2 – Kitchen and Storage (April2012 – August 2012) Renovation Stages - After

  21. PHASE 2 – Kitchen and Storage (April2012 – August 2012) Renovation Stages - After

  22. PHASE 3 – 8th Grade Hallway and Courtyard B (May 2012 – August 2012) The new 8th grade hallway will be where rooms 127 and 128 are now. Also, Courtyard B will be between the 7th grade hallway and the 8th grade hallway. Also, there will be the new TV Studio where room 100 is now. Renovation Stages - After

  23. PHASE 4 – *6th Grade Hallway, Courtyard A,* Art Rooms, Chorus Room and Music Room (September 2012-December 2012) Renovation Stages - After

  24. PHASE 4 – 6th Grade Hallway, Courtyard A, *Art Rooms, Chorus Room and Music Room* (September 2012-December 2012) Renovation Stages - After

  25. PHASE 5 – *7th Grade Hallway*, Library, Health Room, Computer Lab (January 2013 – May 2013) Renovation Stages - After

  26. PHASE 5 – 7th Grade Hallway, *Library, Health Room, Computer Lab* (January 2013 – May 2013) Renovation Stages - After

  27. PHASE 6 – FCS, Computer Lab, Gym (March 2013 – August 2013) Renovation Stages- After

  28. PHASE 7 – Hallways and Entrance (June 2013 – August 2013) Renovation Stages - After

  29. PHASE 8 – Admin Offices and Auditorium (June 2013 – November 2013) Renovation Stages - After

  30. By the end of November 2013, this school will be complete.

  31. On the first week of May, lunches will be moved into the front side of the gym. • Also in May, the classes in the back hallway will be moved into the auditorium. How You Will Be Affected

  32. ANY QUESTIONS?