1 / 7

Lab Results Interfaces S&I Framework Initiative

Lab Results Interfaces S&I Framework Initiative. Bi-Weekly Initiative Meeting. September 26, 2011. Agenda. Moving Forward Workgroup Updates Q&A + Group Discussion. Summer of Standards Harmonization. Begin Code Development. F2F Meeting. IG Draft Version 0.1. HL7 Out of Cycle Ballot.

jag
Download Presentation

Lab Results Interfaces S&I Framework Initiative

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lab Results InterfacesS&I Framework Initiative Bi-Weekly Initiative Meeting September 26, 2011

  2. Agenda • Moving Forward • Workgroup Updates • Q&A + Group Discussion

  3. Summer of Standards Harmonization Begin Code Development F2FMeeting IG Draft Version 0.1 HL7 Out of Cycle Ballot • April: • Lab Reporting Implementation Guide Analysis – policy and Conceptual Designs drafted • In-scope Test approach reviewed and outlined • May: • Recommendations for IG • Vocabulary recommendations completed • Vocabulary alignments completed • Complete Public Health High Level Roadmap • June: • Final F2F Meeting to come to consensus (proposed Jun 13-15) • Prepare any needed documentation for RI/DP • IG guide drafted • July: • Initial Pilot planning • IG Guide Version 0.2 drafting completed • August: • IG Version 0.3 drafted • Report findings to HITSC • September: • “Key Stakeholder” Messaging and Outreach • IG Version 0.5 drafted • HL7 ballot opens for IG • Pilot launch • October: • HL7 IG ballot closes • Fall: • Draft MU Stage 2 Rule Major Upcoming Milestones We Are Here

  4. Implementation Guide Analysis WG • Volunteer Leads: Ken McCaslin, Hans Buitendijk Action Items/Next Steps • LRI IG Version 1.5 Draft was submitted to HL7 Friday 9/16 • Begin reconciling known issues with the IG in preparation for ballot reconciliation • Review recommendations focused on enhancing readability • Complete identified missing examples • Content change requests should go through the official ballot process; minor changes that do not affect the content should be brought to the IG WG

  5. Validation Suite WG • Volunteer Lead: Robert Snelick Action Items • Reviewed artifacts from MU1 NIST Test Tools • Organized Test Data into 20 key tests Next Steps • Delivered spreadsheet of segments, fields and components constrained by LRI IG • Call for committed workgroup members participation • NIST LRI Test Tool • Test Data collection, SME review and verification • Prepare for October Face To Face • Continue Software development of Validation Suite components

  6. Pilots WG • Volunteer Leads: Robert Lutolf and Rob Allen Action Items • Updated LRI Pilot Guide • Defined Timeline • Outreach activities in progress to recruit new Pilots Next Steps • Continue Pilot Outreach • Prepare for October Face To Face • Committed Pilots complete Pilot Project Brief Wiki page and develop a plan to complete steps in Pilot Guide

  7. Q&A + Group Discussion

More Related