70 likes | 159 Views
Lab Results Interfaces S&I Framework Initiative. Bi-Weekly Initiative Meeting. September 26, 2011. Agenda. Moving Forward Workgroup Updates Q&A + Group Discussion. Summer of Standards Harmonization. Begin Code Development. F2F Meeting. IG Draft Version 0.1. HL7 Out of Cycle Ballot.
E N D
Lab Results InterfacesS&I Framework Initiative Bi-Weekly Initiative Meeting September 26, 2011
Agenda • Moving Forward • Workgroup Updates • Q&A + Group Discussion
Summer of Standards Harmonization Begin Code Development F2FMeeting IG Draft Version 0.1 HL7 Out of Cycle Ballot • April: • Lab Reporting Implementation Guide Analysis – policy and Conceptual Designs drafted • In-scope Test approach reviewed and outlined • May: • Recommendations for IG • Vocabulary recommendations completed • Vocabulary alignments completed • Complete Public Health High Level Roadmap • June: • Final F2F Meeting to come to consensus (proposed Jun 13-15) • Prepare any needed documentation for RI/DP • IG guide drafted • July: • Initial Pilot planning • IG Guide Version 0.2 drafting completed • August: • IG Version 0.3 drafted • Report findings to HITSC • September: • “Key Stakeholder” Messaging and Outreach • IG Version 0.5 drafted • HL7 ballot opens for IG • Pilot launch • October: • HL7 IG ballot closes • Fall: • Draft MU Stage 2 Rule Major Upcoming Milestones We Are Here
Implementation Guide Analysis WG • Volunteer Leads: Ken McCaslin, Hans Buitendijk Action Items/Next Steps • LRI IG Version 1.5 Draft was submitted to HL7 Friday 9/16 • Begin reconciling known issues with the IG in preparation for ballot reconciliation • Review recommendations focused on enhancing readability • Complete identified missing examples • Content change requests should go through the official ballot process; minor changes that do not affect the content should be brought to the IG WG
Validation Suite WG • Volunteer Lead: Robert Snelick Action Items • Reviewed artifacts from MU1 NIST Test Tools • Organized Test Data into 20 key tests Next Steps • Delivered spreadsheet of segments, fields and components constrained by LRI IG • Call for committed workgroup members participation • NIST LRI Test Tool • Test Data collection, SME review and verification • Prepare for October Face To Face • Continue Software development of Validation Suite components
Pilots WG • Volunteer Leads: Robert Lutolf and Rob Allen Action Items • Updated LRI Pilot Guide • Defined Timeline • Outreach activities in progress to recruit new Pilots Next Steps • Continue Pilot Outreach • Prepare for October Face To Face • Committed Pilots complete Pilot Project Brief Wiki page and develop a plan to complete steps in Pilot Guide