An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Twinning projectENEA – ENforcing Environmental Acquis 4th Steering Committee César Seoánez Skopje, 9th of February, 2016

  2. OUTLINE • 4th quarter assessment (12 October 2015 – 11 January 2016) • Quarterly Report 4 • Programme for next 6 months (12 January – 11 July 2016) • Operative Side Letter 5 • Outputs delivered to Steering Committee • Addendum 2 Twinning Project ENEA – ENforcing Environmental Acquis

  3. 4th QUARTER: Coordination • Meetings: multiple, within missions, with stakeholders, including Inspection Council • Main outputs & conclusions so far communicated and forwarded • E-inspection software team  communicate with SEI • Coordination with TA project supporting local level & Twinning IED • Coordination with training programme of TA project • Coordination meeting organised by MoEPP  sharing & review of relevant docs • Mutual participation in workshops of Twinning & TA in November & December • Info exchange continues Twinning Project ENEA – ENforcing Environmental Acquis

  4. 4th QUARTER: Communication • Website: www.sei.gov.mk • SEI banner now visible in MoEPP’s website • First promotional video published online • Estimate of visibility materials to be prepared in following months Twinning Project ENEA – ENforcing Environmental Acquis

  5. 4th QUARTER: Progress vs. Work Plan Twinning Project ENEA – ENforcing Environmental Acquis

  6. 4th QUARTER: Progress vs. Work Plan • Good Twinning Project ENEA – ENforcing Environmental Acquis

  7. 4th QUARTER: Activities October (starting 12th ) • Activity 1.2, mission 7: factsheets for industrial sectors • Activity 1.2, mission 5: check lists for some waste streams • RTA Training in Brussels, 15-16 October • Activity 1.2, mission 4: last mission for general inspection manual • Activity 1.3, mission 3: preparation of training materials • Steering Committe 3 Twinning Project ENEA – ENforcing Environmental Acquis

  8. 4th QUARTER: Activities November • Activity 3.1, follow-up of mission 1: BPMS assessment & 1st recommendations • Activity 2.1, mission 4: workshop & 1st draft of Law for Inspection on Environment • Activity 2.1, mission 6: other supporting materials & training on planning (IRAM) • Activity 1.2, mission 10: 2nd mission to finalise IPPC/BAT guidelines • Draft Addendum 2 & meetings with Inspection Council December • Activity 2.2, mission 5: 4 one-day workshops on inspection cycle • Activity 1.2, mission 8: 2nd mission to finalise factsheets for industrial sectors • Updates to Addendum 2 upon request of CFCD Twinning Project ENEA – ENforcing Environmental Acquis

  9. 4th QUARTER: Activities Main outputs • SEI - Twinning website • Inspection manual • Draft sector inspection checklists & factsheets (12 sectors) • Trainings on IRAM & Inspection Cycle • Workshop & draft Law for Inspection on Environment • Draft proposals for indicators to evaluate inspectorate & inspectors • SEI’s BPMS assessment & first proposals for next steps Twinning Project ENEA – ENforcing Environmental Acquis

  10. 4th QUARTER: Activities Other outputs • Translation of Spanish templates for multiannual insp. plan & annual programme • First promotional video in FIIAPP’s web • Addendum 2 Twinning Project ENEA – ENforcing Environmental Acquis

  11. 4th QUARTER: Participation BC experts • 140 BC participants in meetings held in missions • A lot of drafting (to continue until February 2016) Twinning Project ENEA – ENforcing Environmental Acquis

  12. 4th QUARTER: Expenditures • As planned • Savings in flight tickets • In 4th quarter ~ 19 % of activities’ budget Twinning Project ENEA – ENforcing Environmental Acquis

  13. QUARTERLY REPORT • Addendum 2: training  needs urgent endorsement • Central planning & control of inspectors •  new Law should come into force • Inspection Council should address Twinning docs sent, • to align to EU best practices Overload in planning & reporting, evaluation of inspectors with financial penalties... • Inspection Council activity should get the attention of EC • Paragraph slightly reformulated Twinning Project ENEA – ENforcing Environmental Acquis

  14. QUARTERLY REPORT • Managers in SEI, MoEPP, CFCD, DEU & SEA should continue pushing for a change in Law for Insp. Supervision • Review & implement recommendations for improvement • 2nd update: deleted recommendation about E-inspection project, as it was cancelled Twinning Project ENEA – ENforcing Environmental Acquis

  15. PROGRAMME NEXT 6 MONTHS January • Activity 1.2, start of mission 6: 2nd mission for check lists waste streams • Activity 2.1, start of mission 8: control & remediation of old polluted sites • Activity 1.2, mission 11: 1st mission leaflet operators & communication strategy February • Activity 2.1, mission 7: other supporting documents • Steering Committee 4 • Activity 3.1, mission 2: proposals for BPMS improvement • Activity 1.2, mission 12: 2nd mission to finalise leaflet operators & comm strategy Twinning Project ENEA – ENforcing Environmental Acquis

  16. PROGRAMME NEXT 6 MONTHS  TRAINING April-May April-May March June March-May July Twinning Project ENEA – ENforcing Environmental Acquis

  17. PROGRAMME NEXT 6 MONTHS March • Activity 1.3, mission 4: 2 two-days trainings on industrial processes (regions 1 & 2) • Activity 1.3, mission 5: 2 two-days trainings on industrial processes (regions 3 & 4) • Activity 1.3, mission 6: training based on inspection to pilot installation (region 1) April • Activity 1.4, mission 3: study visit to The Netherlands • Activity 1.3, mission 7: 3 one-day trainings on comm. skills & team building • Activity 2.2, mission 6: training based on inspection to pilot installation (region 3) Twinning Project ENEA – ENforcing Environmental Acquis

  18. PROGRAMME NEXT 6 MONTHS April • Steering Committee 5: 22nd April • Activity 3.1, mission 3: training on use of IRAM software May • Activity 1.3, mission 8: 3 one-day trainings on comm. skills & team building • Activity 2.2, mission 7: training based on inspection to pilot installation (region 2) • Activity 3.1, mission 4: further work on BPMS (to be defined in missions 3.1.2-3) • Updated project’s brochure Twinning Project ENEA – ENforcing Environmental Acquis

  19. PROGRAMME NEXT 6 MONTHS June • Activity 2.2, mission 7: training based on inspection to pilot installation (region 4) • Activity 2.1, mission 9: first training on sampling & monitoring • Activity 2.1, mission 10: second training on sampling & monitoring July(until 11th) • Closure event Twinning Project ENEA – ENforcing Environmental Acquis

  20. OPERATIVE SIDE LETTER 5 • Side letter 10: expert for mission 2.1.7 + 2 flights for act. 1.2 • Included Marc du Maine in act. 1.3 • Explicit approval of OSL is very welcome Twinning Project ENEA – ENforcing Environmental Acquis

  21. COMMENTS TO OUTPUTS DELIVERED TO ST.C.? • 2.1.4 – Draft Law for Inspection on Environment • 2.1.4 – Report related to the draft Law, and Table of Concordance • 3.1.1 – BPMS assessment and first proposals for next steps • 2.1.6 – Procedure & minutes template for small incident/accident • 2.1.6 – IRAM’s users guide • 1.2.10 – Guidance on BAT on storage of hazardous and non-hazardous waste • 1.2.10 – Guidance on “mirror code waste” classification • 1.2.6 & 1.2.8 – 12 sector & waste inspection checklists • 2.1.8 – Issues to comply with EU legislation on soil protection • 2.1.7 – Indicators to evaluate inspectors & Inspectorate Twinning Project ENEA – ENforcing Environmental Acquis

  22. ADDENDUM 2 Need for urgent endorsement • Training missions in March  RTA affected • Study tour in April  participation of RTA Assistant and of 11th participant All your support is needed! Twinning Project ENEA – ENforcing Environmental Acquis

  23. Thank you very much ! Благодараммногу! www.sei.gov.mk blinkov_d@yahoo.com inspection.cs@gmail.com Twinning Project ENEA – ENforcing Environmental Acquis