250 likes | 389 Views
THE SHAW GROUP, INC. “PANTHER FINANCIAL”. Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals. Florida Institute of Technology Design and construction of a 12,600 s.f . commercial office building to be used as a financial institute
E N D
THE SHAW GROUP, INC.“PANTHER FINANCIAL” Prepared for: Mr. Michael Bolch Shaw Group
Project Scope and Client Goals • Florida Institute of Technology • Design and construction of a 12,600 s.f. commercial office building to be used as a financial institute • SW corner of Babcock St. and Palm Bay Blvd. in Palm Bay, Fl • Create a construction schedule using MS Project • Generate an estimated probable cost • Develop construction contracts and terms
Project Management Plan • Divided into 3 parts • Project Controls • Project Scope • Project Schedule • Structural Design • Layout • Structural analysis / Member design • Connections • Hurricane damage mitigation • Legal Aspects • Contract development & terms • Preparation for negotiations • Regulatory Agencies
Project Size and Cost • Steel structure • 2 stories • 12,600 s.f. • Parking lot • Transportation • Level of service analysis • Water and sewer system design • Geotechnical • Foundation design • Total Estimated Cost: $1,895,000.00 ($150.00/s.f.)
Structural Design • Key Elements • Layout • Structural analysis / Member design • Connections • Hurricane damage mitigation
Anticipated Final Design PANTHER FINANCIAL
Structural Analysis / Member Design • Two Dimensional Dr. Frame Analysis • Determining Maximum Shear, Moment, and Axial Loads being less than the Design Load
Connections / Drawings • Shear Connections are bolted • Moment Connections are shop-welded and bolted
A3 Web-Shear Connection • 6 – A325 ½” bolts based on Slip Critical Strength • L2½” x 2½” x 1/2 Double Angles based on Areas
Hurricane Damage Mitigation • Constructed on raised foundations above sea level • Built upon steel, concrete, or wooden pilings or anchored to solid rock • All concrete is reinforced with steel • Specialized doors and windows • Using shutters over doors and windows during hurricanes
Legal Aspects Contract Development Preparations for Negotiations Permits, Licenses, Agencies
Contract Development-1 • Contract Development for Panther Financial • Description of lands/site • Contractors Responsibilities • Labor • Schedule • Permits • Owners Responsibilities • Communication • Payments • Insurance
Contract Development-2 • Change Orders • Claims • Tests and Inspections • Dispute Resolution • Good Faith Negotiations • Mediation • Arbitration • Litigation • Liquidated Damages
Negotiations • Preparation for Negotiations • Gather outside information • Establish points of leverage • Set a goal • BATNA • Shoot for a Win - Win conclusion
Permits, Licenses, Agencies Follow codes and regulations Acquire permits and licenses Keep in good standing with agencies and the public
Project Summary Scope Schedule Estimated Cost Structural Design Contract Development Negotiation Tactics Codes, Permits, and Licenses
Thank you for choosing The Shaw Group, Inc. • Project plan will meet client’s goals • We will produce a quality project • We appreciate your business • Your Project Manager • Stephen M. Craig • StephenCraig11@gmail.com • (412) 657-6263