An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. October 18-20, 2010 LONG BEACH, CALIFORNIA

  2. October 18-20, 2010 LONG BEACH, CALIFORNIA Airside Capacity Evaluation Techniques Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport Matt.Davis@Atlanta-Airport.com

  3. Agenda Define the Problem What’s the Appropriate Tool? What are Your Data Sources? Challenge Your Assumptions Gain Consensus

  4. Define the Problem What Is Your Airfield Problem? What Do Your Stakeholders Think the Problem is? Is it in the Airspace? Other Airport Conflicts? Obstacles? Noise Abatement Routes? Is it on the Ground Taxi in/Taxi Out Delay? Runway Crossings? Apron Congestion/Gate Availability? How Do You Define Your Problem? Demand versus Capacity, Delay, Or Something Else? Air and/or Ground Delay Gate Utilization Payload/Range

  5. Sample Problems San Antonio Airspace San Antonio International Airport Runway 3-21 Vs Randolph Air Force Base 15-33 Stinson Municipal ILS on Runway 14-32 Kelly Air Force Base – Runway 15-33 Stinson Municipal Airport – Runway 14-32 San Antonio International Airport Runway 12-30

  6. SAT Airspace Image

  7. Sample Problems Ground Hartsfield-Jackson Atlanta International Airport 6th Runway? Air and/or Ground Delay versus Taxi times South Gate Complex? Gate Utilization/Availability Air and/or Ground Delay versus Taxi times Extension of Runway 9L-27R Payload/Range Extension of Runway 10-28 Air and/or Ground Delay versus Taxi times vs. 6th Runway

  8. ATL 2009 Comprehensive Development Plan

  9. Gate Metrics

  10. Gate Metrics

  11. 2008 ATL Gate Analysis

  12. 2008 ATL Gate Analysis

  13. Gate MetricsAirfield Capacity vs Gates Source: Jacobs Consultancy, February 2008

  14. Gate MetricsAirfield Capacity vs Gates Source: Jacobs Consultancy, February 2008

  15. FAA ASV Delay Curve

  16. What’s the Appropriate Tool? Traditional Airfield Capacity Tools AC 150/5060-5a Airport Capacity Handbook (ACRP currently studying an update to this 1985 document). FAA Airfield Delay Model (Another 1980’s cheap solution) Airfield Simulation Models (Very Complex & Very Expensive) SIMMOD, TAAM, Airport Machine and FAA Technical Center RDSIM. This is not an exhaustive list. Gate Scheduling Models Numerous commercial and proprietary software packages are available. Airfield Models Are Data Sensitive. The Lack of Quality Data Can Make Your Results Suspect.

  17. Tool Box • Handbooks/nomographs • (FAA Airport Capacity and Delay Advisory Circular) • “Analytical” models • (time-space diagrams, FAA Runway Capacity and Annual Delay models) • Runway queuing models • (L&B’s AirSim, Delays) • Microsimulation models • (SIMMOD, ADSIM/RDSIM, TAAM) • Real-time simulation methods • (FAA and NASA tower simulators)

  18. ATL ASV Calculation

  19. VTASIM Range of Results

  20. VTASIM Range of Results

  21. SIMMOD Sample • Simmod Video clip

  22. What Are Your Data Sources? Analysis is only as good as the data from which it is derived from. Official Airline Guide (OAG) for Airline Schedule Information Does not include Cargo, Charter, Military or General Aviation Operations FAA - ASPM, Tower Counts, and ASR-9 records. RITA BTS Only includes those airlines that provide ACARS data to FAA No International Flight Information Airport Records Recorded Observations Sensis Aerobahn Passur

  23. VTASIM Range of Results • AeroBahn clip

  24. Challenge Your Assumptions How Do the Airlines/ATC Respond to These Events at Your Airport IMC Conditions: What is the split between VMC and IMC? CAT II and below: how often are you in low visibility conditions? Snow/Icing Conditions: Throw their hands up in the air and quit? What is the Impact of the Airlines’ Business Plans on Your Analysis? What Are the Little Things You Can Do To Make Valuable Improvements? End Around Taxiways Strategically Placed High Speed Exits New Runway Crossing Locations There Are Several Small Improvements That Can Pay Off In The Long Run.

  25. Gain Consensus Get Agreement Up Front on The Metrics You Will Use How Detailed Do The Results Have To Be? Delay in the Apron Areas, Runway Crossing, or Departure Queue Overall Taxi times. (Delay plus unimpeded taxi time) What’s Important and to Whom? How Important is Safety When You are Preparing a Benefit/Cost Analysis? How Do You Measure Safety if Your Concern is Efficiency? What if There is No Differential Savings in the Results, but the Outcome is More Predictable? What’s Your Definition of Acceptable Delay?