Status Report #08 AVTS Automated Vehicle Tracking System

Apr 9 th 2012. Status Report #08 AVTS Automated Vehicle Tracking System. David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection system used to build a database for law enforcement to utilize when searching for vehicles. Need for Design

jalena
Download Presentation

Status Report #08 AVTS Automated Vehicle Tracking System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Apr 9th 2012 Status Report #08 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection system used to build a database for law enforcement to utilize when searching for vehicles.

  2. Need for Design • Aid in the apprehension of suspects and the rescue of abductees in the event that vehicular information is known. • Milestones • Assembly – 02/24/2012 04/12/2012 • GUI Completion – 03/1/2012 • Server Integration – 03/30/2012 • Data Encryptions – 04/10/2012 • License Algorithm Completion – 04/17/2012

  3. Recent Tasks • Image Processing • Met With Dr. Grigoryan • Provided ideas to improve algorithm • No Other Pertinent Updates • Panda Board Automation • Formatted Data to be Sent to Server • Completed Autonomous Perl Script

  4. Recent Tasks • Server Automation • No Pertinent Updates • User GUI Access • Finalized Webfiles • Final Report • Completed and Submitted First Draft • Demo Day Poster Complete

  5. Ongoing Tasks • Image Processing • Tweak Algorithm • Panda-Server Integration • All Pieces Need to Work Together • Final Draft of Report

  6. UpcomingTasks • BBQ at David’s House – xx/xx/xxxx • Demo to Professor – 04/13/2012 • Final Report 2nd Draft – 04/16/2012 • Demo Day – 04/19/2012 • Final Submission – 04/25/2012 • Final Report, Evaluations, Project File

  7. Block Diagram

  8. Schedule