60 likes | 361 Views
Future Work. Three timelines Immediate (next week): finalize the Year 2 annual report! Next month, before the NASA PI’s meeting (May 4-6, 2009): Poster Year 3: project expires on May 8, 2010 Datasets WCRP CMIP3 dataset (precip, temp, monthly)
E N D
Future Work • Three timelines • Immediate (next week): finalize the Year 2 annual report! • Next month, before the NASA PI’s meeting (May 4-6, 2009): Poster • Year 3: project expires on May 8, 2010 • Datasets • WCRP CMIP3 dataset (precip, temp, monthly) • NEXRAD precipitation (4-km grids) for Region 12 (Gulf States) • River masks (4-km grids) for Region 12 (Gulf States) • Land use and land cover (LULC)(4-km grids) for Region 12 (Gulf States) MODIS LAI, Fveg, Tskin,… • Water chemistry samplings • Modeling • Bias-corrected dynamical downscaling • Hydrological modeling • River routing • Water quality modeling • Estuary ecosystem modeling • Integration (multi-disciplinary and multi-scale) • Climate (weather)–water–ecosystems–coastal zone • Climate change (current future) • Land use and land cover change
Annual Mean LAI (2002-2007) Model MODIS
Annual Mean GVF (2002-2007) Model AVHRR
Skin Temperature (7/12/2004 21:00UTC) Model GOES