A Commitment to Energy Efficiency AND Energy Management . John Songer, CEP Plant Engineer Rochester City School District. The Presenter - John Songer, CEP. Plant Engineer for Rochester City School District Certified in Energy Procurement Responsible for $11M/yr. utility budget

jalila
Download Presentation

A Commitment to Energy Efficiency AND Energy Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Commitment to Energy Efficiency ANDEnergy Management John Songer, CEP Plant Engineer Rochester City School District

  2. The Presenter - John Songer, CEP • Plant Engineer for Rochester City School District • Certified in Energy Procurement • Responsible for $11M/yr. utility budget • Controls & Energy Services background

  3. Rochester City School District • A “Big Five” District in New York State with nearly 35,000 Students • 50+ Facilities - average age 64 years • 7.1M Sq. Ft. • $11M annual utility budget • Purchase 8,960,000 kWh Wind Energy Annually

  4. Energy Management – a commitment built on Partnerships • Internal and External Customers • Policies and enforcement • Conservation Programs • Energy Efficient Upgrades • Tracking and Monitoring Results • Benchmarking utilities and maintenance

  5. Energy Management cont. • Maintenance – Steam Trap, coils, filters, boiler tuning, belts, building envelope etc. • Custodial Operations- Scheduling Events, Work Orders, HVAC Preventative Maint. • Education and Awareness of Employees. • EMS Programs – Holiday, Recess, Snow Day, Night setback, schedule selections • Utility Meters – Pulse heads. • Procurement – Multiple Strategies. • Data Base of Expenses.

  6. Energy Management cont. • In 2001-2002 Fiscal • Natural Gas 4,501,057 therms $2,781,964 .618 • Electricity 53,863,071 kWh $4,462,918 .083 • In 2005-2006 Fiscal • Natural Gas 3,473,308 therms $4,959,239 1.428 • Electricity 48,098,974 kWh $4,274,325 .089 • Increase efficiency of mechanical and electrical systems • Introduce energy education and awareness to students and staff • Reduce pollution emissions • Use utility rebates, State aid and incentives

  7. Energy Project Financials Total Project Cost: $20,565,644 Total Est. kW Savings: 2,106 kW Total Est. kWh Savings: 6,858,626 kWh annually Total Est. mmBtu Savings: 49,363 mmBtu annually Emissions Total Est. NOX reduction: 5 tons annually Total Est. SOX reduction: 16 tons annually Total Est. CO2 reduction: 5,757 tons annually

  8. Project Statistics Equipment Installed: • 5 new boiler plants • 27,000 lighting fixtures • 2,500 occupancy sensors • 300,000 square feet of new ceiling • high efficient motors • vending machine controls

  9. Project Description • Replace ceilings and upgrade lighting • Standardize (one Mfr.) and upgrade energy management systems (EMS) • Install high efficiency motors and variable speed drives • New boiler plants in 5 schools • Burner management systems on all large boilers

  10. Project Delivery Methodology • Construction management web site • Pulse heads on utility meters tied to EMS • Local ESCO, design firms and contractors • Benefits local economy • Standards and specifications • Lamps, ballast, motors, and drives • Continuity in perpetual inventories, quantity discounts, product warrantees

  11. Team/Resources • District Personnel • Architects / Construction Inspectors • Engineers • Custodians • Operations / Maintenance • Security • Administrators / Legal Counsel

  12. Team / Resources (continued) • ESCO & Design Firm Personnel • Professional Engineers • Registered Architects • Certified Energy Managers • Construction Managers

  13. Why Energy Performance Contracting? • Capital project bond limitations • Construction cycles limit energy savings • Energy & O&M savings with improved comfort, lighting, and air quality • Strong implications on student performance, health and safety • EMS upgrades improve control, load shedding, and monitoring capability

  14. RCSD Project Process • Comprehensive Energy Audits (CEA) from NYSERDA Flex Tech program • Request for Proposals (RFP) to ESCOs. ESCOs required to perform CEA on 2 sample schools • Selection was made for local ESCO with the highest quality, lowest cost proposal • Awarded to Wendel Energy Services LLC

  15. RCSD Project Process (cont.) • Graded ESCOs for • Statement of Qualifications • Technical capability • Staffing Plans • Financial Terms • Project Schedule

  16. How is RCSD Unique? • Chose “professionally assisted performance contract” approach • ESCO proposals disclosed all costs (comparable to capital renovation costs) • All phases of project (design through pay applications) require District review and approval • Local design firms and contractors used • Education and awareness program through the Alliance to Save Energy with local project leader • Over 20 engineering mentors volunteer to educate students in energy conservation

  17. Benefits • Environmental stewardship • Improved learning environment • Reduced maintenance and operations costs • Reduced consumption as hedge for increasing utility commodity costs • Create/retain jobs in local economy

  18. Lessons learned • State Historic Preservation Office • State Education Department • ESCO selection • Operations & Maintenance issues • Plan ahead for abatements, product selections, deliverables, monitoring systems, and installation schedules

  19. Current Status • 7.4 M kWh/yr savings • Students have saved >$300,000 • Improved comfort, aesthetics, and test scores • Conservation Programs funded from traditional sources • First K-12 in NYS to receive EPA Leaders Award • Six facilities have Energy Star Labels

  20. Related Issues • Energy Procurement • Purchase energy from Municipal Cooperatives • Budget • EPC must create a positive cash flow • Monitoring and Verification • Automate, Automate, Automate • Questions • john.songer@rcsdk12.org 585-336-4152