1 / 11

Aarhus in Belgium

Aarhus in Belgium. Presentation of www.aarhus.be. Development of aarhus.be Site structure and content Management of the site. Development. Collaboration between: the Flemish Region the Walloon Region the Brussels-Capital Region the federal authority  coordination: federal.

jalila
Download Presentation

Aarhus in Belgium

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aarhus in Belgium Presentation of www.aarhus.be

  2. Development of aarhus.be • Site structure and content • Management of the site

  3. Development • Collaboration between: • the Flemish Region • the Walloon Region • the Brussels-Capital Region • the federal authority •  coordination: federal

  4. Development • Different people: • 4 Aarhus focal points (1 for each Region + 1 federal): preliminary texts • 1 coordinator • ICT-team

  5. Development • Planning (2006): • Experts’ texts (April) • Writing and many proof readings in French (April - June) • Translation in Dutch (June -July) + in English and German (July) • Design (June -July) • Launch of the site (September)

  6. Development • Conclusions: • Full collaboration between different people • Language by language • Part by part • Respecting timing and deadlines

  7. Management of the site • Coordinator collects information from the different Regions and the federal authority • Regular updating of the content: ‘news’, new internet links, new publications or reports, etc.

  8. Challenge: keeping the site dynamic • Intended developments • adding a list of environmental issues and competences in Belgium • further development of “GMO” and “access to justice” • adding links to other national nodes

More Related