An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Timing, Gain Calibration, Error Banks K. Akiba Kazu Akiba

  2. Commissioning • The software developments/issues reported here are dedicated towards the commissioning of the Velo. • Timing affects directly the quality of the data: precision is required. • The calibration of the gain and eventual equalization of the system were never tried. • It is also the first attempt to understand the sources of DAQ (Tell1) errors and develop methods to correct it. • The tasks involve the combination of PVSS – Vetra – Macros, and eventually an optimisation procedure is developed. Kazu Akiba

  3. Timing Sadia Khalil*, Ivan Mous★ *Syracuse, ★Nikhef Kazu Akiba

  4. ADC digitisation sampling • TELL1 setting, per link granularity == 5.4 k Parameters • Defines the time to digitise the beetle outputs. • Independent of the beam: adjusted with test pulses. • Method to optimise implemented, and checked. Kazu Akiba

  5. Digitisation sampling scan: • Takes the Beetle analogue signals links • 64 links/Tell1, 84 Tell1s. • ADC digitisation scan (DELAYSCAN) runs on the Tell1 with steps of 25/16 ns – Corresponding Vetra job makes the histograms. • Macro analyses the resulting histograms per link basis and sets the optimal delay settings. Kazu Akiba

  6. Digitisation sampling phase: • An xml file is produced and uploaded to the Tell1 recipes. • A set of macros is used to cross-check the optimized values with the expected noise/TP height. TP Value on the optimal delay compared to TP run. Kazu Akiba

  7. Pulse Shape Sampling • To be adjusted to the beam: affects the S/N, spillover and pre-spill. • Velo wrt LHC clock, LHCb trigger • Each sensor wrt to the Velo: time of flight, cable lengths. • Method of time alignment relies on the synchronous modifications of the TTC to each sensor-Tell1. • Mechanism for the determination under development. • Tests using test pulses as “fake beam”: • PVSS scan implemented. • Vetra Analysis in place: pulse shape plot, pulse shape fit. • Under current development: • Cross check and tests with previous TED data. • Implementation of the optimised settings on the PVSS recipes. Kazu Akiba

  8. Pulse shape: the plan • Use Test pulses to measure the pulse shape. • Determine peak time for each sensor: • Minimal data sample approach: event by event fitting with coarse (25 ns) samples. • NZS data analysis. • Fitting with an analytical function as well as a template histogram are under studies. Kazu Akiba

  9. Proof of principle. Peak (ns) Amplitude Credits to Ivan Mous Width 2 Width 1 Constant (offset) Spillover (ns) Kazu Akiba

  10. Checking the Method • Based on sets of 100 events spaced by 25 ns. • Using the Function approach, the Optimum time can be reconstructed for any phase (time shift). • Systematic error in determining the peak time under investigation Kazu Akiba

  11. Applying to the TED run:PRELIMINARY TELL1 29 TELL1 30 Kazu Akiba

  12. Gain Grant McGregor Manchester Kazu Akiba

  13. Measure  Calibrate • First attempt to measure the Gain of different Links. • Current method uses the ADC of the headers (NZS data) as an estimate of gain. • Crosscheck to be done with TP data: needs (both) Timing to be adjusted first. Should be available in the next weeks. Kazu Akiba

  14. First Results: FHS • Separate measurement of the header high value and header low, using last 2 beetle bits: HH-HL = FHS, a pedestal independent quantity. Full Header Swing (FHS) “Header-High” distribution “Header-Low” distribution Kazu Akiba

  15. Variation across links/sensors Low gain/dead links Kazu Akiba

  16. Towards Calibration • Currently the study was performed only with the header ADCs. • Next natural comparison would be with the TP Data. • PVSS scan over the Tell1 gain (Arx DAC) was recently created: to be tested and tuned. • Gain vs step will give the setting to be used. Kazu Akiba

  17. Error Banks Ann Van Lysebetten ★, Chiara Farinelli ★, Tomasz Szumlak* ★ Nikhef, *Glasgow Kazu Akiba

  18. Chasing the TELL1 Errors • Decoder: working, to be debugged further • Pseudo header error: • thresholds determined from Grant’s analysis • PCN errors under investigation: behaviour of the FEM beetle compared to the module. Kazu Akiba

  19. Pseudo Header Errors Def: Failure to determine the header state… Thresholds as they were: almost 0 Pseudo headers. Thresholds 450/550 We can induce errors  So can get rid of them as well

  20. Ultimate Erroneous Goals • Understanding errors: sources and how to fix them based on the error banks solely. • Tuning up the Velo – Eventually export the settings necessary for no Errors. • Error monitoring package: plots and debugging tools. Kazu Akiba

  21. Summaries • Timing: • Digitisation timing under control. • Pulse shape under tests: Uploading procedure being developed, parameters for the TED to be calculated. • Gain: • First measurements show a spread of ~20% • Scan procedure and analysis under development • Error Banks: • Progress towards understanding and adjusting the TELL1. • Set of useful plots to be determined. Kazu Akiba