1 / 23

2004 USDA Forest Service Activities Model

Graphical representation of activities and actions from the 2004 Planning Rule and Forest Service Manual, presented in a hierarchical structure. Activities in different box colors indicate requirements, situational actions, and directives. Navigate through sub-models with hyperlinks. Prepared by EMC Planning Analysis Group.

jamarm
Download Presentation

2004 USDA Forest Service Activities Model

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Business Activity ModelUSDA Forest Service 2004 Planning Rule This is a graphical model of the activities and actions literally stated in the 2004 Planning Rule and high-level activities from the Forest Service Manual (1920) and Handbook (1909.12). Each activity is presented in a separate box and boxes are arranged in a top-down hierarchy with the most general activities at the top and successively more specific actions in the lower levels. Lines connect the boxes to indicate these “parent – child” or “general – more specific” relationships. The model can be read by inserting the activity phrases from the parent and associated children boxes into the general statement “In order to [parent activity], you must [child activity 1], [child activity 2], etc”. The left-to-right order of boxes at any level is not intended to be sequential but the activities are often arranged this way to help understanding. Activities in green boxes are required by the rule. Activities in yellow boxes are situational, either optional, requiring a choice among alternative activities, or depending upon circumstances. Blue boxes have been used by the PAG group in very limited situations for activities strongly implied by the rule but not literally stated by it. Activities in aqua boxes are from the directives. Slide #2 is the topmost sub-model. Other sub-models are shown on other slides. Use the hyperlinks “Go to sub-model” and “Return” to navigate between levels. Prepared by the EMC Planning Analysis Group, Fort Collins COSarah Hall (Project Lead), Bob Lee, Bruce Meneghin, Susan Winter, Greg Alward Go to model

  2. 2004 Planning Rule and Directives Business Requirements Model Go to Submodel 1 Go to Submodel 3 Go to Submodel 4 Go to Submodel 5 Go to Submodel 6 Go to Submodel 7 Go to Submodel 8

  3. 1 Return

  4. 3 Go to Submodel 3.7 Return

  5. 3.7 Return

  6. 4 Go to Submodel 4.2 Go to Submodel 4.4 Go to Submodel 4.5 Go to Submodel 4.6 Go to Submodel 4.7 Go to Submodel 4.11 Return

  7. 4.2 Go to Submodel 4.2.3 Return

  8. 4.2.3 Go to Submodel 4.2.3.1 Go to Submodel 4.2.3.4 Go to Submodel 4.2.3.5 Return

  9. 4.2.3.1 Return

  10. 4.2.3.4 Return

  11. 4.2.3.5 Return

  12. 4.4 Go to Submodel 4.4.4 Return

  13. 4.4.4 Go to Submodel 4.4.4.1 Return

  14. 4.4.4.1 Return

  15. 4.5 Return

  16. 4.6 Return

  17. 4.7 Go to Submodel 4.7.9 Return

  18. 4.7.9 Return

  19. 4.11 Return

  20. 5 Return

  21. 6 Return

  22. 7 Return

  23. 8 Return

More Related