Business Process Reengineering / Best Practices

Business Process Reengineering / Best Practices. Steve Smith. November 22, 2004. What is Business Process Reengineering?. Process - a logical set of related activities taking inputs, adding value through doing things, and creating output.

jamessclark
Download Presentation

Business Process Reengineering / Best Practices

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Business Process Reengineering / Best Practices Steve Smith November 22, 2004

  2. What is Business Process Reengineering? • Process - a logical set of related activities taking inputs, adding value through doing things, and creating output. • Business Process – “a set of activities that transform a set of inputs into a set of outputs (goods or services) for another person to process using people or tools.” 1 • Goal: to determine the best and most efficient ways to accomplish a task and implementing them • 50 – 70% of business reengineering attempts fail 1 http://www.prosci.com/intro.htm

  3. Stages to Business Process Reengineering2 • Stage 1: Preparation • What is the level of organizational commitment? • What are the project goals? • Who should be on the team • Stage 2: Identifications • What are the major business processes? • What are the strategic processes? • What are the business breakpoints? • What processes should be reengineered within certain time frames 2 http://earthrenewal.org/bprmist.htm

  4. Stages to Business Process Reengineering • Stage 3: Vision • What are the subprocesses and activities, making up the major processes • How do information and resources flow through the processes • Determine why the company is doing things the way they are • What are specific improvement goals • Are there ways to achieve business goals that seem impossible today? • Stage 4: Solution: Technical Design • What are the required resources and technologies needed in the reengineered process?

  5. Stages to Business Process Reengineering • Stage 5: Solution • What are the required human resources? • How will responsibilities change? • What training programs will be required? • Who is most likely to resist change? • Stage 6: Transformation • How and when should progress be monitored? • How should unanticipated problems be handled? • How is the momentum for continuous change sustained?

  6. Pitfalls for Business Process Reengineering • Employee resistance to change • Inadequate attention to employee concerns • Inadequate and inappropriate staffing • Inadequate developer and user tools • Mismatch of strategies used and goals • Lack of oversight • Failure in leadership commitment

  7. Best Practices • - “A method which has been judged to be superior to other methods. Many times it is the most efficient way to perform a task “3 • BPR is used to identify best practices • SAP R/3 has between 800 and 1000 best practices within it • Benchmarking – compares an organization’s methods with peer groups, with the purpose of identifying best practices and to lead to superior performance. • The company attempting to identify a best practice is the entity that actually determines if the discovered process is indeed a best practice 3 http://isds.bus.lsu.edu/cvoc/learn/bpr/mprojects/bp/bpbasics.html

  8. Reengineering Options • Clean Slate Reengineering • basically everything is designed from scratch • has no predefined constraints • slower and harder to apply • more responsive to organizational needs • Technology Enabled Reengineering • the system is selected first and then processes are reengineered • faster and cheaper than clean slate engineering • usually changes the organizational processes heavily

  9. Clean Slate VS Technology Enabled Advantages Disadvantages • Not constrained by tool limitations • Company may have unique features where vendor best practices aren’t appropriate • Not subject to vendor software changes • No preexisting structure to design • May involve more consultants • May be more costly • May not work with selected ERP Clean Slate Technology Enabled • Focus on ERP best practices • Process bounded thus easier • Know that the design is feasible • Experience of others ensure designs will work • Software is already developed • system evolution possibly limited by technology • No relative advantages (other people can use the system too) • All best practices may not be available

  10. Business Process Reengineering / Best Practices Any Questions?