1 / 10

Guinn Hall Project, Summer 2014 Scope of Project

Guinn Hall Project, Summer 2014 Scope of Project. Painting Flooring T ub surrounds Tile in bathrooms Electrical upgrades L ight fixtures New doors Ceilings 12 th floor lounge Furniture replacement Microfridge purchase. Floor Elevator Atrium Area. After. Before. Hallway. Before.

jane
Download Presentation

Guinn Hall Project, Summer 2014 Scope of Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Guinn Hall Project, Summer 2014Scope of Project • Painting • Flooring • Tub surrounds • Tile in bathrooms • Electrical upgrades • Light fixtures • New doors • Ceilings • 12th floor lounge • Furniture replacement • Microfridge purchase

  2. Floor Elevator Atrium Area After Before

  3. Hallway Before After

  4. Student Room Doors Before After

  5. Student Room Walls Before After

  6. Bathroom • Before • After

  7. Room Desks • Old Built-in Desks & Dressers • New Desks & Bookshelves

  8. Beds and Dressers • Old Bed • New Bed and Dresser

  9. Amenities • New Microfridge • Old Refrigerator

  10. Students Make TWU Home

More Related