420 likes | 622 Views
ITSO Trans Talk. DIVERGING DIAMOND INTERCHANGE (DDI) DESIGN. Vern Swing, P.E. & Steve Manhart, P.E., PTOE, PTP November 5, 2010 -- University of Minnesota. Presentation Outline. Interchange Types Case Study - Elk Run Interchange Diverging Diamond Interchange Design Characteristics
E N D
ITSO Trans Talk DIVERGING DIAMOND INTERCHANGE (DDI) DESIGN Vern Swing, P.E. & Steve Manhart, P.E., PTOE, PTP November 5, 2010 -- University of Minnesota November 5, 2010
Presentation Outline • Interchange Types • Case Study - Elk Run Interchange • Diverging Diamond Interchange • Design Characteristics • Advantages • Use in North America • Questions
Interchange Types • Basic Diamond
Interchange Types • Diamond System Interchange
Interchange Types • Full Cloverleaf
Interchange Types • Partial Cloverleaf (Parclo)
Interchange Types • Partial Cloverleaf (Parclo)
Interchange Types • Trumpet
Interchange Types • Directional T
Interchange Types • Single-Point Urban Interchange (SPUI)
Interchange Types • Roundabout
Interchange Types • Large Radius Roundabout
Interchange Types • Diverging Diamond Interchange
Diverging Diamond Interchange (DDI) • Springfield, MO
Diverging Diamond Interchange (DDI) • Diverging Diamond Interchange (DDI)
Diverging Diamond Interchange (DDI) • Diverging Diamond Interchange (DDI)
Diverging Diamond Interchange (DDI) • Diverging Diamond Interchange (DDI)
Diverging Diamond Interchange (DDI) • Diverging Diamond Interchange (DDI)
Diverging Diamond Interchange (DDI) • Advantages • Improved Safety • Operationally More Efficient • Expandability • Can be more cost-effective (especially when retrofitting an existing diamond interchange to DDI)
Case Study: TH 52 • Elk Run Interchange Project • Interchange Design Project • Estimated Cost: $36 Million Total Project Cost
Elk Run Interchange Project • Project Development Area
Elk Run Interchange Project • Mn/DOT S.P. 2505-48 (TH 52)
Elk Run Interchange Project • Mn/DOT S.P. 2505-48 (TH 52)
Elk Run Interchange Project • Mn/DOT S.P. 2505-48 (TH 52)
Elk Run Interchange Project • Mn/DOT S.P. 2505-48 (TH 52) • Interchange Options Considered • Large Radius Roundabouts • Smaller Radius Roundabouts • Single-Point Interchange • Diverging Diamond Interchange - DDI (NOTE: FHWA refers to DDI as Double Crossover Diamond – DCD)
Diverging Diamond Interchange (DDI) Q) Are there headlight concerns, since traffic is directly in front of each other before the crossovers? A) No. The direct headlight approach is a further distance than a common scenario where a left turn lane is directly opposite the opposing left turn. The headlights do not affect the crossover movements since vehicles are angled away from each other at the crossovers. Putting up any type of headlight shields (also known as glare screens) on the curb is ill-advised since there will be a in safety due to poor sight distance.
Proposed Elk Run DDI • Findings • Mn/DOT proposed diamond interchange layout reaches maximum capacity at 40% build-out. • Proposed DDI layout reaches maximum capacity at 79% of build-out. ►DDI Concept was ultimately selected by Mn/DOT.
Use in North America • I-44 & MO-13, Springfield, MO • I-15 & Main St, American Fork, UT • I-15 & 500 East, American Fork, UT • I-70 & Woods Chapel Rd, Kansas City, MO • I-435 & Front St, Kansas City, MO • Botts Rd & M-150, Kansas City, MO • I-270 & Dorsett Rd, St. Louis Co, MO • Along Baltimore-Washington Pkwy, Anne Arundel Co, MD • Hwy 427 & Rathburn Rd, Toronto, ON • I-5 & Fern Valley Rd, Phoenix, OR • New Circle Rd Interchanges, Lexington, KY • I-590 & Winton Rd, Rochester, NY • I-75 & US 224/SR-15, Findlay, OH • I-480 & Tiedman Rd, Brooklyn, OH • Ashford-Dunwoody Rd Interchange, Atlanta, GA • 8 Interchanges in/around Atlanta, GA • West Catawba/Exit #28, Charlotte, NC • I-95 & Thurbers Ave, Providence, RI • IL-59 & I-88, Naperville, IL • US-129 Bypass / Bessemer St/ Middle- settlements Rd Interchange in Alcoa, TN
Questions? Vern Swing, P.E. Principal Transportation Engineer/ President RLK Incorporated vswing@rlkinc.com Steve Manhart, P.E., PTOE, PTP Sr. Transportation Engineer II RLK Incorporated smanhart@rlkinc.com 6110 Blue Circle Drive, Suite 100 Minnetonka, MN 55343 952-933-0972 www.rlkinc.com