100 likes | 207 Views
PRICING DETAILS OF AMC WITH M/S GEE. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS. (RECOUPMENT NOT CONSIDERED). DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS FEP SPARES LUMPSUM CHARGES. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS. ROAD MAP FOR FINALISING AMC.
E N D
DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS (RECOUPMENT NOT CONSIDERED)
DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARSFEP SPARES LUMPSUM CHARGES
ROAD MAP FOR FINALISING AMC • IN-PRINCIPLE APPROVAL ACCORDED BY SRPC BOARD – 6TH JUNE 2006 • DISCUSSIONS WITH GE REPRESENTATIVES – 15TH JUNE - 15TH OCT 2006 • TO BE PUT UP TO POWERGRID BOARD FOR APPROVAL. – BY 10TH NOV 2006 • MoU SIGNING WITH CONSTITUENTS – BY20TH NOV 2006 • AWARD OF CONTRACT TO M/S GE – BEFORE 30 TH NOV 2006
AMC CONTRACT SCOPE • The Scope of work includes: • Comprehensive maintenance support both for Software and Hardware of SCADA/EMS system installed under SR ULDC scheme covering all control centers in SR (Sub-LDCs, SLDCs, RLDC). • Deployment of trained engineers at SRLDC and all SLDCs (one engineer at each location) • 24x7 support for all critical faults within 30 minutes • Service level agreement at assured availability (penalty in case assured availability is not maintained) • Well defined preventive maintenance schedule.
1 OF 2 RESPONSIBILITY MATRIX
2OF 2 RESPONSIBILITY MATRIX