MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011. www.lymmostudy.com. Purpose of Today’s Update. Provide study progress to date Review status of East/West and the Parramore BRT corridors Present refined North/South Corridor alternatives
E N D
MetroPlan OrlandoCitizens’ Advisory CommitteeRefined North/South Corridor Update - September 28, 2011 www.lymmostudy.com
Purpose of Today’s Update • Provide study progress to date • Review status of East/West and the Parramore BRT corridors • Present refined North/South Corridor alternatives • Present summary of public input • Review study schedule www.lymmostudy.com
Study Progress To Date • Since March 2010 – Evaluated possible expansion of LYMMO based on technical analysis and public input • East/West Corridor • Parramore Corridor • North/South Corridor • System Analysis www.lymmostudy.com
Current Status Not Currently Funded System AA Report www.lymmostudy.com
LYMMO East/West and Parramore CorridorsLocally Preferred Alternatives www.lymmostudy.com
Initial North/South Corridor Alternatives North South www.lymmostudy.com
Corridor Screening Process • Screening evaluation based on the six goals: • Improve Mobility and Transit Accessibility • Assure Equitable Transportation Options • Enhance the Quality of the Environment • Enhance the Social Integrity of the Community • Develop Transportation Options that are Financially Viable • Promote Economic Development • Subarea Options • East/West • Parramore • North • South Refined Option(s) Base Build Alternatives Refined Alternatives www.lymmostudy.com
Public Input • Meetings/events were held to solicit public input on the North/South Corridor • College Park Neighborhood Association – February 7 • Downtown South Main Street (Board of Directors) – February 10 • Lake Formosa Neighborhood Association – July 19 • Park Lake Highland Neighborhood Association – July 21 • Mills50 Main Street (Design Committee)– August 2 • Wadeview Park Neighborhood Association – August 8 • Ivanhoe Village Main Street (Board of Directors) – August 10 • Ivanhoe Village Main Street (Merchant Mixer) – August 15 • South Corridor Neighborhood Update – August 29 www.lymmostudy.com
North CorridorProposed Refined Alternatives 2. Orange Ave./Hospital/College Park 1. Alden Rd./Hospital www.lymmostudy.com
North CorridorProposed Refined Alternatives 4. Orange Ave./Hospital/College Park/Mills Park via Rollins St./Princeton St. (Two Routes) 3. Orange Ave./Hospital/Mills Park via Rollins St. www.lymmostudy.com
North CorridorProposed Refined Alternatives 5. Orange Ave./Hospital/Mills Park via Princeton St./Virginia Dr. www.lymmostudy.com
North CorridorPublic Comments • Majority preferred Alternative 4 with some combinations: • Alternative 4 with a loop on Virginia Drive • Alternative 4 and 5 (most preferred) • Alternative 5 with connection to College Park • Alternative 2 and 5 Alternative 2 Alternative 4 Alternative 5 www.lymmostudy.com
North CorridorPublic Comments • Other alternatives (provided by Ivanhoe Village) • Connect to Baldwin Park • Further north/south on Edgewater Drive • Further south on Mills Avenue www.lymmostudy.com
South CorridorProposed Refined Alternatives(South St. to Miller Ave.) 1. Lucerne Ter./Sligh Blvd. 2. Orange Ave./Gore St./Sligh Blvd. 3. Orange Ave./Columbia St./Sligh Blvd. www.lymmostudy.com
South CorridorPublic Comments • Majority preferred Alternative 3 with a combination of either Alternative 2 or 3 Alternative 2 Alternative 3 www.lymmostudy.com
South CorridorProposed Refined AlternativesSouthern End Options (Miller Ave. to Michigan St.) 1. Stop at Sodo via Orange Ave. 2. 2-Way on Orange Ave. 3. Orange Ave./Delaney Ave./ Miller Ave. Loop www.lymmostudy.com
South Corridor (Southern End Options)Public Comments • Majority preferred Alternative 2 and 3 • with some combinations: • Alternative 1 and 2 without entering Sodo • Alternative 2 and 3 without entering Sodo • Phase in Alternative 1, 2 and 3 • Access Sodo in front of Target via Crystal Lake Street • Alternative 1 and 2 - Alternative 2 could be phased in once development occurs near Michigan Street Alternative 2 Alternative 1 Alternative 3 www.lymmostudy.com
Study Schedule July to October 2011 - LYMMO North/ South Corridor refined alternatives analysis (including Trunk Corridor) November to December 2011 – Added public outreach and identify Locally Preferred Alternative (LPA) January to February 2012 – Complete System AA North/South Corridor LPA evaluation Connections to East/West and Parramore BRT System implementation strategy www.lymmostudy.com
Contact Information Alan Danaher Project Manager PB Americas, Inc. 407.587.7835 danaher@pbworld.com • Tony Walter • Director of Planning • LYNX • 407.254.6009 • twalter@golynx.com Ginger Corless Public Outreach Coordinator HHI Design 407.838.2559 (office) 407.616.5500 (cell) gcorless@hhidesign.com www.lymmostudy.com