10 likes | 163 Views
Tested all inputs to the box Temp Boards: “Too warm” tested and ok “Too cold” is firing a “too warm”, signal can be cleared by PVSS?!? Cooling and Vacuum PLC: tested and OK Tested all outputs: all HV channels ok all LV channels ok signals to cooling and motion PLC ok
E N D
Tested all inputs to the box • Temp Boards: • “Too warm” tested and ok • “Too cold” is firing a “too warm”, signal can be cleared by PVSS?!? • Cooling and Vacuum PLC: tested and OK • Tested all outputs: • all HV channels ok • all LV channels ok • signals to cooling and motion PLC ok • Tested internal logic of the box: • from PLCs and Temp Board inputs up to HV all ok • To be done: • putting box in place, cable it up (2 lemos and 2 long flat cables to be made) • next week wrap-up meeting: decision on TB logic, plan final test and test plan for the future. • Population of spare PCB Testing the interlock box Ann, Tony, Stefano, Mark, Jan, Eddy, Martin, Luc 29/02/2008