1 / 16

Introduction

Introduction. TARP UPDATE Navy Packaging Board. Dec 2009. TARP Global Presence. Norfolk. Program Office Mechanicsburg. Cherry Point. Jacksonville. Bahrain. Bremerton. Japan -North. Lemoore. Japan -South. San Diego. Pearl Harbor. Med (Rota). TARP Ship Riders

Download Presentation

Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction TARP UPDATE Navy Packaging Board Dec 2009

  2. TARP Global Presence Norfolk Program Office Mechanicsburg Cherry Point Jacksonville Bahrain Bremerton Japan -North Lemoore Japan -South San Diego Pearl Harbor Med (Rota) TARP Ship Riders Mobile Nodes

  3. TARP Deployments Ships: USSBonhomme Richard, (LHD6)/11 MEU CLB USS George Washington (CVN73) USS Bataan (LHD5) / 22nd MEU CLB Mobile Nodes: AL Asad Kandahar Camp Leatherneck (251 RIP to 252 as of 11/30) Camp Bastion FY 09 Exercises: See next chart

  4. FY09+ Exercise Support

  5. TARP Support • Mass Updates to NAVICP packaging data • Code updates Migrating packaging codes to MIL-STD-2073-1E ~ >1,000,000 • Aligning Type of Storage codes with DLA ~ 400,000 • Populating Weights and Dimensions ~ 10,600 • Improving Shelf life data ~ 800 • ERP Support • Refining Functional Design Specifications • Assisting with Data Validation • Providing requirements for potential P700 portal application • Submitting Requests for Change • Providing input for Business Transition Plan

  6. TARP Support (Continued) • P700 Enhancements • Added thumbnail image functionality for specialized Duct Containers • Modified Item “Type of Storage” Codes Definitions • Provides link to 49CFR173.424 for NIINs:013163474 & 012027264 & 011257324 • Demilitarization and Controlled Inventory Item Codes added to all three Levels of NAVICP packaging • Titles for NAVICP Levels of Packaging changed. Level 1 title changed to "Afloat Activities & Forward Deployed MALS". Level 2 title changed to "Ashore Activities & Non-Deployed MALS (In Garrison)". Level 3 title changed to "New Procurements, Organic and Contractor Commercial Repair Depots". Detail document for each of the three NAVICP levels of packaging also published. • Level 2 packaging includes "Equal or better" functionality for packaging materials (Wrapping, Cushioning, Unit and Intermediate Containers). • Provides optimum fiberboard box NIINs for use within the 15450 reusable containers. • Fiberboard boxes required when packing items in Multi Unit Containers (MUCs). Increased guidance for packaging Power Supplies. • P700 CD • Integrating Marine Corps and NOLSC packaging data into CD product (P700-CNP CD) • Re-engineering CD application using Java technology

  7. TARP Support (Continued) • TARP Toll-free Hotline (877)ICP-TARP • Respond to calls from Field and Fleet • Common Access Card / PKI Issues • Packaging Code Lookup Questions • Alternate Container Requests • General TARP Information • Received over 500 calls during TARP III timeframe

  8. TARP Certification • Properly Identify Item • Package IAW P700-CNP • Properly Mark for Shipping • Apply Appropriate Tape Properly DLA Operation Order 0331-08 5.The KCC receipt process for all other receipts entering and Distribution Depot is changed to: ………. d. Technical Assistance for Repairable Protection (TARP) Returns, no verification is required unless materiel appears to have been tampered with or compromised in transit.

  9. Weight and Dimensions Improvement Initiative • Gather Cube and Dimension data at ATAC Norfolk • Aggregate and Analyze Captured Data • Format and Submit Mass Update to NAVSISA

  10. TARP Website

  11. Online P700-CNP PIR Form Packaging Improvement Recommendations Under Review 25* Approved 1450** Denied 111** **Cumulative totals since PIR module with automated workflow developed (Sept 9 2002)

  12. Deficiency Sampling • Inbound (BC1, BC2) & Outbound BC2 • R&R / BMDs • Trans-shipper • RDO • Metrics

  13. Corrective Actions • Take on-the-spot corrective actions • Multiple and/or significant deficiency • Contact activity and arrange a visit • Next visit to an activity • Utilize an Activity Profile Report as training aid

  14. Activity Profile Report Summary

  15. Activity Profile Deficiency Report Detail

  16. Summary Integration of PHS&T, ATAC, eRMS and TARP setting the “benchmark” standards for Navy Packaging

More Related