The economic challenges of reaching broadband ubiquity

Speeding up NGN ubiquity: a pillar for digital growth. The economic challenges of reaching broadband ubiquity. Athens, 13 February 2014 • Dr Matt Yardley. Introducing Analysys Mason. EC – Digital Agenda (costs, benefits, funding models, incentive policies)

Download Presentation

The economic challenges of reaching broadband ubiquity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Speeding up NGN ubiquity: a pillar for digital growth The economic challenges of reaching broadband ubiquity Athens, 13 February 2014 • Dr Matt Yardley

  2. Introducing Analysys Mason • EC – Digital Agenda (costs, benefits, funding models, incentive policies) • ITU– PPPs for universal broadband • EIB – market development and funding models • Operators – NGA strategy • Governments – national broadband plans and state aid • Regulators – competition issues in NGA • Investors– NGA transactions

  3. Ubiquity costs • Source: Analysys Mason, typical fixed NGA cost analysis First 75% homes € N bn Last 25% homes € N bn

  4. Rural costs vary strongly depending on technology – fixed vs wireless … Fixed Indicative Cost Wireless % of homes covered

  5. … and these two critical aspects are highly market-dependent Fixed Indicative Cost Wireless % of homes covered

  6. The final 5% is now a hot topic in the UK

  7. UK FTTC speed variability is narrower than in1st gen. broadband – good news for the DA • Source: Ofcom data, 2013 38Mbit/s packages 76Mbit/s packages 3.0 3.3 3.5 3.5 3.5 81% of headline 3.4 78% of headline Speed (Mbit/s) Speed (Mbit/s) 33.1 64.2 30.9 30.6 60.4 59.3 Max 24 hours 8-10pm weekdays Max 24 hours 8-10pm weekdays Av variance Av variance Av min Av min

  8. Outcomes will also depend on how Member States implement policy • There is some latitude in interpreting the DA targets which will impact solutions across Member States • A very rigid view on 30Mbit/s, i.e. to all users under all conditions,would effectively eliminate wireless (by driving up costs to levels higher than fixed) • There is an inherent tension between playing it safe with incumbent operators vs stimulating new competition • The sustainability risks are greater in rural areas – driven by cash-flow issues more than set-up costs • Member States need to think hard about geographic carve-ups • This can have unintended consequences

  9. Public policy questions still remain • Funding: Our EC work suggests a funding gap of €60 billionto meet DA 30Mbit/s coverage & 100Mbit/s take-up targets • Demand-side: • Connecting “the unconnected” (see below) remains a major challenge, with multiple issues involved • Source: Ofcom CMR 2013

  10. These are exciting times! • Future of UHF radio spectrum (EC High Level Group) • Media consumption uncertainties: • Broadcasting to mobile networks • Prospects for linear TV distribution on fixed networks(e.g. using multicast) • Drivers for QoS in networks (e.g. cloud, public services) and business model implications • Growing day-to-day reliance drives need for resilience – perhaps less well understood that it should be

  11. Thank you