Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye. Project. Design a stormwater drainage system for the city of Bluffdale. Assess current infrastructure Assess current drainage needs for a 100 year 24 hour storm Design of new infrastructure using EPA SWMM
E N D
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye
Project Design a stormwater drainage system for the city of Bluffdale • Assess current infrastructure • Assess current drainage needs for a 100 year 24 hour storm • Design of new infrastructure using EPA SWMM • Prepare a cost estimate N
Existing Infrastructure Map of Existing Inlets and Pipe Locations Map of Existing Inlets and Pipe Locations
Existing Infrastructure • 3 Drains in Neighborhood • 1 drain has no pipe exit • 2 drains empty into trench • 9 Drains on Northern Street • Pipes over to Bangeter Highway system
Steps Map of Drainage Basins • Create drainage basins for each inlet • Find the depth of the 100 year 24 hour storm • Calculate flow lines and accumulations • Calculate curve number using soil type and land use data • Export information into HEC-HMS Analysis of Drainage Needs
HEC HMS HEC-HMS Model HEC-HMS Output
EPA SWMM Flow Volume vs. Time in Fullest Pipe Depth of Water and Inlets Depth and Flow in Pipes Depth of Water in Pipe vs. Time
Final Design Final Design Existing.................. Proposed ……………. Pipe Labels…………… Inlet Label…………… 1b 1a 3 1 3 2b 4b 2 2a 4a 4 5b 6b 5 5a 6a 6
Final Design Pipe elevation and length information Inlet elevation and box depths Cross Pipe depths