An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Under Ground Excavation in progress @ Twin Tunnel Nathdwara end

  2. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Under Ground Excavation in progress @ Twin Tunnel Nathdwara end

  3. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Tunnel face of Nathdwara end

  4. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED DBM completed @ Ch. 255 + 200 LHS DBM completed Service Road with drain @ Ch. 232+650 LHS

  5. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Girder Erection work in progress at Khari River Bridge @ Ch. 214+507

  6. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED DBM Completed @ Ch. 191+340

  7. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED WMM work in progress at Major Junction @ Ch. 183+800 LHS

  8. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Girder Erection work in progress at Rajsamand Flyover @ Ch. 204+653

  9. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Foundation work in progress at Minor Bridge @ Ch. 240+725 Reinforcement Steel fixing for Raft of Box Culvert @ Ch. 240+900

  10. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Girder Erection work in progress at Rajsamand Flyover @ Ch. 204+653

  11. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Arrangement of 2nd pile load test by Kentledge Method @ KhariRiver Bridge @ Ch. 241+507

  12. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Hard barricading provided at Nathdwara Elevated Flyover Hard barricading provided at Rajsamand Flyover

  13. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Fixing of flexi Road Signages at various prominent locations

  14. SHREENATHJI UDAIPUR TOLLWAY PRIVATE LIMITED Road safety Awareness programme conducted at various locations