1 / 11

Il Progetto MIUR-CRESCO Centro computazionale di RicErca sui Sistemi COmplessi

Il Progetto MIUR-CRESCO Centro computazionale di RicErca sui Sistemi COmplessi. Attività di modellistica delle INTERDIPENDENZE tra Reti Complesse SP-III-5 ENEA, CRIAI, Univ Tor Vergata, Unv. Campus Biomedico. CRESCO. Sottoprogetto SP-III-5 : Interdipendenza tra reti complesse .

javen
Download Presentation

Il Progetto MIUR-CRESCO Centro computazionale di RicErca sui Sistemi COmplessi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Il Progetto MIUR-CRESCOCentro computazionale di RicErca sui Sistemi COmplessi Attività di modellistica delle INTERDIPENDENZE tra Reti Complesse SP-III-5 ENEA, CRIAI, Univ Tor Vergata, Unv. Campus Biomedico

  2. CRESCO Sottoprogetto SP-III-5: Interdipendenza tra reti complesse. • Sviluppare una metodologia e alcuni codici di integrazione dei modelli di simulazione di LCCIs al fine di studiare le interdipendenze tra le varie infrastrutture e fornire delle indicazioni ai decisori responsabili delle gestione delle situazioni di crisi. ENEA - Workshop 22 Giugno 2007

  3. CRESCO SP-III-5 • Sistema distribuito per lo studio delle interdipendenze tra due o più infrastrutture critiche mediante la simulazione di alcuni scenari reali o ipotizzabili. • Confronto fra due approcci di simulazione • Simulazione ad Agenti. • Simulazione basata sul modello Entità-Risorse. • Il Sistema si avvale anche dell’utilizzo di Simulatori delle singole infrastrutture. ENEA - Workshop 22 Giugno 2007

  4. CRESCO SP-III-5 (Infrastrutture) Primary cabin 20 kV line National grid substation 380/220 -150 kV high voltage 150-220 kV N HV line (owned) Secondary cabin 380 V line End users Primary cabin W E medium and low voltage networks HV line (national grid) S Electrical Distribution Networks

  5. CRESCO SP-III-5 (Infrastrutture) Telecommunication Networks 5

  6. CRESCO SP-III-5 (Scenario) Gestire i problemi di interdipendenza tra differenti infrastrutture Gli apparati TELECOM necessitano di energia elettrica per funzionare. Le batterie di back up hanno una durata limitata. Electrical Distribution Networks Telecommunication Networks Il tele-controllo delle cabine primarie avviene tramite linee di trasmissione dati che dipendono dalla disponibilità della rete TELECOM.

  7. Roma Mini TELCO Black-outJanuary 2004 CRESCO SP-III-5 (Scenario) AND AND AND Damaged equipment replaced Trip of main power supply Loss of power supply Telco services restart Legend Safe network state Collapsed network Endangered network state Event Disturbed network state Root cause NETWORK STATE OVERVIEW & ROOT CAUSES Pre-incident TELCO network in secure state Station continue working with decreased battery autonomy Many external Telco services go down, as the ACEA data links between control centers The normal power supply from ACEA was restarted Return to normal state AND 90 min. 3 The full functionality of the SGT station is restored 2 The battery autonomy finished as Fire Brigate was not able to eliminate water in time. 1 Flood on the apparatus room of the Telco SGT station. UPS start from batteries 4 hours ENEA - Workshop 22 Giugno 2007

  8. GRID LAYER CRESCO SP-III-5 (Architettura) UTENTI/INTERFACCIA GIS CRESCO MIDDLEWARE SP-III-5 SIMULATORI ENEA - Workshop 22 Giugno 2007

  9. CRESCO SP-III-5 (Architettura) Grid Simulatore Traffico Simulatore Rete Telecomunicazione Simulatore Rete Elettrica Middleware CRESCO SP-III-5 Simulatore Rete Ferroviaria ENEA - Workshop 22 Giugno 2007

  10. CRESCO SP-III-5 (Architettura) Simulatore Rete Elettrica Simulatore Rete Telecom. CRESCO MIDDLEWARE GRID MIDDLEWARE ENEA - Workshop 22 Giugno 2007

  11. ENEA UTENTI/INTERFACCIA GIS CRIAI MIDDLEWARE GESTIONE RICHIESTE CAMPUS BIOMEDICO Modello di Società ad Agenti Modello Entità - Risorse Tor Vergata CRIAI MIDDLEWARE INTERFACCIAMENTO SIMULATORI SIMULATORE RETE ELETTRICA SIMULATORE RETE TELECOM SIMULATORE Infrastruttura n ENEA ENEA - Workshop 22 Giugno 2007

More Related