1 / 20

Dynamic Car Planning

Dynamic Car Planning. CSXT’s optimized empty car distribution system. ACACSO November 14 th , 2013 Tony DiDeo CSX Transportation. CSX Car Management Organization. Jack Vierling Assistant Vice President Car Management. Planning. Distribution. Anthony DiDeo

javiert
Download Presentation

Dynamic Car Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dynamic Car Planning CSXT’s optimized empty car distribution system ACACSO November 14th, 2013 Tony DiDeo CSX Transportation

  2. CSX Car Management Organization Jack Vierling Assistant Vice President Car Management Planning Distribution Anthony DiDeo Director Freight Car Planning & Utilization Brenda Wheeler Director Metals, Automotive & Flats Jeffrey Brubeck Director Boxcars & Flats Bruce Curtis Director Covered Hoppers, Minerals & Military Bryce Thomas Director Freight Car Planning– Coal & Auto Mary Hollin Manager Equipped Gondolas Eddie Shelton Manager Multi-levels Kirk Blomgren Manager Boxcars Angela George Manager Minerals Ric Cole Director Freight Car Planning– Merchandise Tim Poineau Manager Gondolas Tammy King Specialist Multi-level Distribution Lynne Kimball Specialist Paper Boxcars Tom Yeager Manager Unit Trains Natasha Zuraikat Director Freight Car Utilization – Car Hire Brad Moe Specialist Equipped Gondolas Steve Wicker Specialist Multi-level Distribution Mark Withrow Specialist Paper Boxcars Paul Newtson Manager Jumbo Covered Hoppers Kyle Campbell Manager Freight Car Planning & Utilization – Equip. Rents Karen Hoffman Specialist Gondolas Janet Zborowski Manager Fleet Management Kyle Peters Specialist Forest Products Vanessa Pyant Specialist Minerals Denise Roper Manager Freight Car Systems Stephanie Reynolds Specialist Auto Boxcars & Flatcars Scott Bolton Manager Engineering Logistics John Sheller Director Fleet Ops - Military

  3. Car Management Objectives • Maximize Order Fulfillment for Customers • Protect the Revenue & Carload Plan • Minimize inefficient empty movements • Effectively manage car hire expenses • Manage maintenance programs Goal: Meet customer’s car requirements through efficient & timely placement of loadable equipment on the day requested

  4. CSX manages 5,000-7,000 empty car orders per week • Car orders are entered through our web-based ShipCSX system • Online Customers enter orders directly into ShipCSX • 84% Online Customers • 16% Ordered by Short Line or their customers • These orders account for approximately 25%-30% of our originated Merchandise carloads • Unit Train, Coal, Automotive & Intermodal traffic do not use car order system • Orders are placed for railroad controlled cars only (excludes privates)

  5. Guidelines for Customer Ordering • Each customer is set up with a profile for the equipment types they can order • Customer can only order on the days they are served • Customer can only order up to their plant capacity • Customers can’t change an order within 7 days unless CM approves • Customer late window of up to 6 days • The week ends on Sunday at 2359 and resets • Cars not placed by this time can roll to next week

  6. Distribution of empty equipment CSXT Controlled Cars Cars flow in one of three ways: • Manual Billing – typical for cars in unit train service • Pool instructions – Empties flow reverse route or to pool home • DCP Directive – Cars flow based on instructions from CSX’s internal optimizer (Dynamic Car Planning) Foreign RR Cars • Empty car flow is dictated by AAR Car Service Rules • Unless cars are in a national pool, empties are either reverse routed or delivered to nearest interchange of car owner • National Pool cars are handled as if they are CSXT equipment unless different instruction are received from pool administrator Privates Cars • Typically run reverse route of the prior load unless the car owner provides different instructions

  7. Equipment Distribution:The Opportunity • Empty cars travel millions of miles each day • Moving empty cars causes additional: • Trains • Fuel consumption • Yard congestion • Track Maintenance • Freight car maintenance • Empty car time creates lost revenue opportunities • Improving asset utilization is key to railroad profitability

  8. Equipment Distribution:The Daily Challenge Many Possible solutions • Car Distributors found it difficult to keep up with the constant flow of information • 100’s of customer car orders • 90,000 car fleet to manage • 65,000 unique origin-destinationpairs

  9. Previous Solutions • Shipper pools • Simplified equipment management • Challenges • Cars were empty 50+% of the time • Missed opportunities to reduce empty car miles • Single Car Allocation • Expert system for car distribution • Allocated empty cars to a nearby customer based on parameters • Challenges • Very localized solution • Difficult to establish and must be well constructed • Effectiveness hard to predict- subject to random events • Cumbersome to adjust with changing traffic patterns

  10. Previous Solutions • Weekly optimization – The Sentinel System • Weekly optimization-based system • Relied on week-ahead forecasts of car supply and orders • Solutions became outdated as conditions changed • Implemented manually through single car system rules • Sentinel demonstrated the value of optimization, but could not deliver it

  11. Dynamic Car Planning System (DCP): History DCPis the first integrated, real-time optimization system implemented in U.S. freight rail Development began in 1995; Implemented in 1997 $5 million cost of development Combined automation, integration, and optimization Continually improved, but original design is still in place

  12. DCP Overview • Optimizer: Maximize order fulfillment at the lowest cost • DCP matches supply with demand and routes empty cars to their first classification point • As the car approaches the classification yard, DCP checks to see if this is still the lowest cost solution for filling the demand. • If it is, the process will continue until the car arrives at the second classification yard prior to the destination at which point the customer name will be applied to the car. • If the supply or demand has changed since the last time the car was classified, then DCP will reroute the car to a new destination.

  13. Optimizer Overview Train Schedules Time/ Mileage Costs Supply History Car Orders Optimizer Origin/Destination Pairs

  14. Demand and Supply Overview DEMAND SUPPLY Customer places up to 6 weeks of orders against one or more equipment profiles 6 weeks of car cycle data compiled Customer profile and equipment preferences associated to demand Data modeled to determine cars arriving at interchange, empty cars in transit, and loaded cars to be emptied The latest 14 days of demand are pulled into the model Cars spread by day, location, car type and supply type before being fed to model OPTIMIZER Optimizer tries to satisfy the demand within the late window(0-6 days) defined by customer profile Optimizer tries to use closest and cheapest supply and have it arrive on-time. The solutions are written out as orig/dest pairs for a specific quantity of cars that are ordered according to which demand should be satisfied first

  15. Key Inputs to DCP Model Equipment Costs – Average hour/mileage costs are used based on the car type the equipment falls into. Operating Costs – The cost to move a generic piece of equipment between each origin and destination is calculated every six months Customer Shortage Costs – The cost of not supplying equipment to a customer. Demand End Date – The point at which the customer no longer wants a car. This is generally the end of the week (Sunday), but customers can specify a day. Customer Location – The zone (yard) that the customer is served out of. Supply Location – The zone that the supply is expected to become available in. Transit Times – The time it takes for a car to be placed at a shipper, pulled from a receiver, and how long it takes a car to travel from an origin zone to a destination zone.

  16. Benefits to CSX • DCP has delivered intended benefits: • Increased customer car order fulfillment • Reduced empty car miles & labor costs • $550+ million saved since implementation • Improved fleet efficiency has allowed CSX to offset the number of railcars bought and/or leased • $1.4 billion capital avoidance Approximately $2 billion in benefits to CSX

  17. Customers use ShipCSX to place orders up to 6 weeks in advance

  18. ShipCSX provides visibility to car order status

  19. DCP supports primary Car Management functions • Compliance in filling car orders on the day requested • Supply cars with the appropriate specifications: cubic capacity, doors, etc... • Provide our services at the least possible cost without forfeiting service or reliability

  20. Questions ???