An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRETINA at ATLAS:status and plan I-Yang Lee Lawrence Berkeley National Laboratory ATLAS Users Workshop August 8 - 9, 2009

  2. GRETINA Collaboration Institutions : LBNL, ANL, MSU,ORNL, Wash. U. Cover ¼ of 4p solid angle Seven 4-crystal detector modules All the required software • Start Construction June 2005 • Start of Operation February 2011 • Engineering and commissioning runs at LBNL 2011 • Operation at: 2012 -2013 • NSCL MSU • HRIBF ORNL • ATLAS ANL

  3. GRETINA Detector modules Three received A-type 36 segments/crystal 4 crystal/ module 148 signal channels /module B-type

  4. Started at the 88” Cyclotron System Assembly Support structure in Cave 4C

  5. Electronics All modules produced Digitizer module (LBNL) 14bit, 100 MHz Energy Leading edge time Constant fraction time Pulse shape Trigger Timing & Control module (ANL) Fast trigger (<300 nsec) Trigger conditions: Multiplicity Sum energy Hit pattern

  6. Electronics installation

  7. Computing Data from GRETINA Detectors 37 segments per detector Segment events Crystal Event Builder Crystal events Signal Decomposition Interaction points 1-28 crystals Data from Auxiliary Detectors Global Event Builder Global Events 70 nodes 2 cpu / node 4 core / cpu Tracking Goal: Processing 20,000 Gamma rays /sec Analysis & Archiving

  8. Pencil beam results Using the latest decomposition program and basis, we have achieved <2 mm (RMS) resolution in PIII: Pencil beam of 662 keV, 1 mm diameter Position resolution : x = 1.5 mm; y = 1.7 mm

  9. Compactness- center of GRETINA is at the designed target position of FMA. Efficiency – comparable to current generation of 4p array Better position resolution –  1-2 mm (rms) Higher counting rate – 36 segments Important features

  10. Installation at FMA • Center of GRETINA is at the designed target position of FMA

  11. GRETINA efficiency • Simulated single-g efficiency  14% at 0.4 MeV 10% at 1.0 MeV

  12. Efficiency of tracking Efficiency including tracking (4p)depends on position resolution and gamma-ray multiplicity Mg = 25, a =10 Eg = 1.33 MeV, Dr = 1 mm

  13. GRETINA count rate • Segment rate is < 10% of that of crystal rate • Run segment at 10 kHz,  100 kHz crystal rate

  14. GRETINA efficiency • Simulated single-g efficiency  10% at 1.0 MeV 5% at 4.0 MeV