1 / 17

District 1 – Team Name

District 1 – Team Name. 30* 80% = 24. District 2 – Team Name. 20 * 80% = 16. District 3 – Team Name. 17* 80% = 14. District 4 – Team Name. 12 * 80% = 10. April’s Challenge COMPLETE this FORM and Return it to me By April 25 Your Hospital Earns

jayme
Download Presentation

District 1 – Team Name

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. District 1 – Team Name 30* 80% =24

  2. District 2 – Team Name 20 * 80% = 16

  3. District 3 – Team Name 17* 80% = 14

  4. District 4 – Team Name 12 * 80% = 10

  5. April’s Challenge COMPLETE this FORM and Return it to me By April 25 Your Hospital Earns 250 pts …..Sheet completed except ESR150 pts …..Energy Star Rating & shared with ASHE400 pts …..Hospital TOTAL District Earns Total Hospital Scores (80% # District)

  6. Only use Hospital ft2 that is connected to the meters reported below NO – Parking Decks NO – Roofs ONLY- Heat/Cooled Spaces

  7. Meter and Cost data should be for the hospital ONLY if possible

  8. Concept Onlynot real data

  9. Concept Onlynot real data

  10. May’s Challenge Complete ONE of the following- Lighting- LED-Lighting Controls and Return it to me By May 30th Your Hospital Earns 150 pts …..completing the form 50 pts….. having VPs signature District Earns Total Hospital Scores (80% # District)

  11. June’s Challenge • Complete ONE of the following- Boiler Replacement-Reduce CFM • - Reduce Outside Air • Free Cooling • - VFD • and • Return it to me • By • June 27th • Your Hospital Earns • 150 pts …..completing the form 50 pts….. having VPs signature • District Earns • Total Hospital Scores • (80% # District)

  12. Low to NO cost items “Low Hanging Fruit” July’s Challenge Complete ONE of the following- RetroCx Worksheet and Return it to me By July 25th Your Hospital Earns 150 pts …..completing the form 50 pts….. having VPs signature District Earns Total Hospital Scores (80% # District) Must actually complete this work • Retro Commissioning • Calibration of controls • Return to working order (ie – repair leaking hot water reheat valve) • Improve staging of chillers • Reduce static pressure drop- ???? Your idea (not already covered) For technical help, call your design engineer, one of the RCx in our association or Joel.

  13. To Win - requires: • Participation • Participation • Participation

More Related