3 Factors To Consider For Smooth Scaffolding Operations

Working on a large building project is more complicated than you think. If you want to ensure your safety, you have to make numerous design and engineering considerations.

Download Presentation

3 Factors To Consider For Smooth Scaffolding Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FACTORS TO CONSIDER 3 FOR SMOOTH • SCAFFOLDING OPERATIONS

  2. 01322 351252 www.jdmscaffolding.co.uk info@jdmscaffolding.co.uk Working on a large building project is more complicated than you think. If you want to ensure your safety, you have to make numerous design and engineering considerations. Erecting a scaffold is a wise choice if there are major construction activities involved. As far as the success of your scaffolding operations is concerned, few factors you should consider have been stated in the slides that follow.

  3. 01322 351252 www.jdmscaffolding.co.uk info@jdmscaffolding.co.uk • DESIGN IT PROPERLY • Let a structural engineer consider the various designing aspects of the scaffold system as it is the first step to kick-start a project. • They will consider your project requirements and let you know whether you need suspended scaffolding, hanging scaffolding or cantilever scaffolding.

  4. 01322 351252 www.jdmscaffolding.co.uk info@jdmscaffolding.co.uk • KNOW YOUR LOAD • Consider the amount of load you are planning to put on your scaffolding in Croydon and ensure that the structure has been designed to endure the load. • Let a competent person categories the load so that it doesn’t create stresses on the members of the scaffolding.

  5. 01322 351252 www.jdmscaffolding.co.uk info@jdmscaffolding.co.uk • EXECUTE THE PLAN • Follow the two stages stated in the previous slides and it will become easier for you to execute your scaffolding plan. • Though scaffolds are considered to be vulnerable structures, make sure your workers are not exposed to any risk.

  6. WEBSITE WEBSITE www.jdmscaffolding.co.uk PHONE NUMBER PHONE NUMBER 01322351252 • Consider the factors stated in the previous slides for smooth scaffolding operations. EMAIL ADDRESS EMAIL ADDRESS info@jdmscaffolding.co.uk ADDRESS ADDRESS 188-192 Manor Road, Erith, Kent,DA8 2AD THANK YOU