An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety Issue #2 • Evaluation of In-Line Inspection Information

  2. Significant Events Timelinefor Olympic PipelineIn-Line Inspections • 1991 Magnetic Flux Tool • 1994 Water Treatment Plant Construction • 1996 Magnetic Flux Tool • 1997 Caliper Tool

  3. 1996 Magnetic Flux Tool Inspection Report

  4. 1997 Caliper Tool Inspection Report Near The Rupture • 0.45” sharp anomaly reported near the eventual rupture area

  5. 16” Olympic Pipeline

  6. 23% wall loss defect X 72” Waterline 16” Olympic Pipeline

  7. 16” Olympic Pipeline

  8. Reassessment Notes-July 97 • Did not inspect this location; • Tuboscope [magnetic flux tool company] possible mill/mechanical 23% (min risk) • Enduro [caliper tool company] .45 sharp (less than repairable) • Difficult area to access

  9. In-line pipeline inspection data along with excavation activity that occurred in 1993 and 1994 were sufficient to justify excavation and examination of the pipeline in the area of reported anomalies.