An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDM based CFL Lighting Scheme “Bachat Lamp Yojana” Initiated by

  2. Clean Development Mechanism (CDM)

  3. Overview • Objectives & benefits of BLY • Current Status • Scheme Architecture • Roles & Responsibilities of involved stakeholders • State wise BLY status & achievements • Barriers to BLY Scheme

  4. Objective What • Quality long-life CFLs would be distributed to grid-connected residential households in exchange of a incandescent lamp (ICL) and INR 15 Who • Implementers who possess both finance and project management skills How • The project cost is covered through sale of GHG emission reductions also known as CERs achieved in the respective Project areas. Specifications of CFLs • Confirm to IS15111 viz. • Life >= 6000 hrs • Power factor >= 0.85 • Confirm to IS 418:2004 viz. • Lumen output >= the ICL replaced. • CFLs carry a BLY logo

  5. Benefits of BLY Scheme • Compared to incandescent lamps, CFLs give 80% energy savings without compromising lumen intensity • This electricity saving is considered taking place directly at the generation end of grid. Since grid is fossil fuel dominated, savings translate to avoided CO2 from coal GHG reduction estimate • 1 tCO2e reduction can be achieved by replacing • Ten 100 W ICL or • Twenty 60 W ICL

  6. Benefits to Stakeholders

  7. Approach • Driver • Reduce first price of CFLs using CDM revenue for domestic users and accelerate Market Transformation. • Value Addition • CDM Programme of Activities registered on 29th April 2010. • BEE is the Co-ordinating and Managing Entity (CME) for BLY. Potential Benefit by 2020 • 0.5 million light-points per project, > 400 projects possible to cover India • Annual avoided capacity ~ 4000 MW

  8. BLY Role Players

  9. BLY Scheme Architecture Communication Buyer in Annex I Country CDM EB PoA -Manager Monitoring report Allocation of CERs DNA Host Approval DOE Issuance of CERs Payment for CERs Coordinating & Managing entity CERs sold CFL IMPLEMENTER HOUSEHOLD Fused CFLs returned Safe disposal of fused CFL/ replaced ICL Buying CFL Replaced ICL lamp Contract for implementation DISCOM CFLs to replace ICLs CFL = Compact Florescent LampICL = Incandescent lamp DOE = Validators BEE = Bureau of Energy Efficiency DISCOM = Distribution Company Provide CPA-DD Consumer database Access to sample groups

  10. Project Development process with Private Investors

  11. Implementation Methods

  12. Role of BEE

  13. Role of CFL Investor

  14. Role of DISCOM

  15. Potential Role of SDAs in BLY

  16. Support from BEE

  17. Progress In Bachat Lamp Yojana • Registration of BLY as Small-Scale CDM Programme of Activities (SSC-PoA ) in the UNFCCC- EB on 29th April 2010. • 50 CPAs included in the BLY PoA. • Till now 29 million CFLs are distributed. • No. of empanelled investors with BEE - 4 • Monitoring & Verification process for BLY-PoA is initiated

  18. Current Status* * As of September 2013 Geographic Coverage

  19. CFL Distribution in Lakhs

  20. Barriers • Sudden fall in CER prices in international markets (11 Euro to 0.1 Euro) • Uncertainty related to the international climate change negotiations • Increased raw material cost for CFL manufacturing (Tri-band phosphorus) • Reduction in fiscal benefits for CFL industries • Lack of investors due to low CER prices

  21. Enable energy efficiency …using CDM Contact Information: Bureau of Energy Efficiency (Govt of India, Ministry of Power) 4th Floor, Sewa Bhawan, R. K. Puram New Delhi- 110 066, India. Tel: 011- 26179699 Fax: 011- 26178352 Email: psamal@beenet.in Website: www.bee.gov.in