An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of LHC installation Sylvain Weisz - LEMIC

  2. Sector 1-2 • LSS1R • Installation of low-β suspended, installation of stand-alone in progress (D2, Q6 in place) • TAN in place, cabling of detectors done (BRAN, LHCf) except for ATLAS Roman Pots • RR17: Power Converters in place, AC and DC cabling in progress, one DQR in place with cooling pump station (Roese) • PM18 • Pressure tests of QULC and QUI done • Arc 1-2 • Jack installation and jumper preparation finished • Cryo-magnet transport in progress (44 MB and 18 SSS in place) • TI2 • Preparation for magnet installation (new line painting this week, support inst. follows) • LSS2L • UA23: Power Converters and water-cooled cables in place, AC and DC cabling in progress; Instalation of kicker pulse generators in progress • RA23: QRLX extension to DFBAC in place • US25 • EL general services (finitions) and CV in progress Sylvain Weisz - LEMIC

  3. Sector 1-2: Cryo-magnet installation starting Pt 1 side Sylvain Weisz - LEMIC

  4. Sector 2-3 & Point 3 • LSS2R • Low-β in place, interconnection in stand by (no interference with ALICE bake-out) • Transport of stand-alone in progress (D2, Q4 in place) • UA27: Power Converters, DQR and water-cooled cables in place; installation of DQS in progress • Arc 2-3 • Cryo-magnet installation in progress (141 MB and 53 SSS in place - MEB allocation of remaining magnets completed Wk 4) • Half-arc (S/s E to I) aligned, interconnection in progress • LSS3L/R • DSLC installation on-going, but accumulating delays … • Design and integration of DSLC bridge at UP33-Tunnel junction still need to be finalised • Warm magnets installed in all available slots (8 MBW and 19 MQW in place) • DQR and DQS in place, installation of water-cooled cable delayed in 3R • DFBAF in place Sylvain Weisz - LEMIC

  5. Sylvain Weisz - LEMIC

  6. Sector 3-4 & Point 4 • Arc 3-4 • Interconnection in progress (global advancement ~50%) • All cold elements in place (MB, SSS, CC & DFB’s) • Rack installation: 198/209 QPS racks and 24/24 PO racks (60 A) in place • RE38: water leaks still there, drain and pump will be installed • Handling accidents occurred when transporting the DFBAG and a warm MQW  damages not critical, but could have been much more important, worrying… • LSS4L/R • All cold elements in place, interconnect in progress (Q6-DFBMG done on both sides) • All beam position monitors installed • Ion profile monitors and wire scanners will be installed at a later stage (equipped with permanent individual bake-out system) • Vacuum pipe installation in progress • Bake-out of sub-sectors D5.R4 and E5.R4 (between D3 and D4) in progress Sylvain Weisz - LEMIC

  7. Sector 4-5 • Arc 4-5 • Interconnect in progress, 8 sub-sectors (out of 14) under vacuum:  expect to close arc cryostat week 9 • Rack installation: all QPS, PO and beam inst. racks in place – cryo inst. still missing • LSS5L • All cold elements in place and interconnected (except DFBLD, expected CW7) • Beam-pipe installation in progress • Low-β reparation: production of new HX tubes starts this week, material at CERN by 16/02:  expect to repair low-β in 5L by early April, ready for cool-down of sector 4-5 • TOTEM cabling and piping done, but more cables are expected … C. Vollinger Sylvain Weisz - LEMIC

  8. Sylvain Weisz - LEMIC

  9. Sector 5-6 • LSS5R • All cryo-magnets in place, alignment this week, low-β interconnect will follow • Warm components in place – vacuum installation in progress • TOTEM cabling in progress • Arc 5-6 and DS • All cryo-magnets in place except Q11.R5 and Q11.L6  critical for interconnect • Interconnection in progress, global advancement ~40% • Rack installation: all QPS and PO racks in place • LSS6L • Modification of IFS boxes (overlap with dump line) starts this week • Stand alone (Q4, Q5) and DFBMM in place, interconnections in progress • All MSD’s in place • Beam-pipe installation in progress • UA63: “endurance” tests in progress • US-UX65: QULA installation in progress Sylvain Weisz - LEMIC

  10. Sector 6-7 & Point 7 • LSS6R: • All MSD’s in place • UA67: short-circuit tests in progress • Arc 6-7: • 154 MB and 51 SSS in place (Q11.R6, Q10.L7 and Q7.L7 expected in March) • Rack installation: 208/209 QPS racks and 24/24 PO racks (60 A) in place • Alignment in progress (1/2 arc done) • Interconnect starts CW7 • LSS7L/R • RR73 & UJ76: ready for short circuit tests, wait for access at Point 7 • Warm magnets: 7 MBW and 24 MQW in place (He ring line non conformity prevents installation of the last MBW) • TZ76 gallery: modification of ventilation system and installation of collimators control racks at stand-still, resumes when access at Point 7 is authorised Sylvain Weisz - LEMIC

  11. Warm Magnet Installation MQW in LSS7L/R MSD at Pt 6 Sylvain Weisz - LEMIC

  12. Sylvain Weisz - LEMIC

  13. Sector 7-8 Sylvain Weisz - LEMIC

  14. Sector 8-1 • LSS8R • Cold part: all elements (magnet & DFBs) in place and interconnected • Warm part: • Vacuum: bake-out in progress • Individual system tests: MKI tested (need second period), injection magnets on-going • Arc 8-1 • Interconnections in progress: low priority, expect to close arc cryostat in March • Rack installation: all QPS, PO and beam inst. racks in place, 59/80 cryo inst. racks in place • LSS1L • DFBLA in place (1st DFBL installed) • Vacuum : bake-out in progress • Cabling of exp. detectors and installation test of BRAN/LHCf into the TAN done Sylvain Weisz - LEMIC

  15. First DFBL ready and installed in LHC tunnel DFBLA in RR13 Sylvain Weisz - LEMIC

  16. Sylvain Weisz - LEMIC

  17. Summary • Cool-down of Sector 7-8 started mid-January, so far so good … • Interconnection on-going in 5 sectors: • Start of sector 6-7 mid-February • Closure of sector 4-5 end of February • 16 DFBM (70%), 8 DFBA (50%) and 1DFBL (20%) in place (4 DFBM available but not installed due to delays on DSLC or corresponding S4) • Rate of warm beam-pipe installation is ramping up: • Procurement and installation planning consolidated • Coordination with individual system tests is tight • 1561 cryo-magnets in place (90%) • Critical issues: • DSLC at Point 3: installation delays, incomplete design • LOW-β: HX repair scenario and planning consolidated by mid-February • Logistics of late elements: need to postpone installation in UJ22 and PX24 Sylvain Weisz - LEMIC