Screen Shots. BOM Details. Lot Sizing Constraints. Produced Item. Routing Used. Alternate Items. Consumed Item. Consumption Ratio. Operation Details. Alternate and Additional Resource. List of Operation-Resource for Selected Route. Production Rate. Calendar.
E N D
BOM Details Lot Sizing Constraints Produced Item Routing Used Alternate Items Consumed Item Consumption Ratio
Operation Details Alternate and Additional Resource List of Operation-Resource for Selected Route Production Rate
Calendar Working Shift, Over Time, Non Working Shift Individual Resource Calendar
Workflow Running Production Plan
Sales Order Plan Explosion of BOM Considering both Material and Capacity Constraints Material Plan
Capacity Plan Capacity Plan in Minutes at Operation-Resource Level
Operation Plan Operation Plan for Selected Work Order Allocation Details for Work Order
Procurement Plan Generated Purchase Orders Proposed Sourcing Dates based on Production Plan
Resource Load Used Capacity by Available Capacity List of Resources
Individual Resource Load Capacity Attributes Load Graph with automatically balanced load
Critical Resource Load Between Two Dates
Inventory Report Ending on Hand at Different Dates List of Items
Item Status Item Status Between Two Dates
Problem Summary - Sales Order Late List of sales orders where Planned End Time is greater than due date and thereby late
Problem Summary – Shortage Report with Available Vs Required Date List of material where available date is greater than required date and shortage quantity
Automated Scheduling Schedule all jobs for all resource either based on just-in-time or resource utilization strategy for given scheduling horizon Automatically schedule all jobs for selected resource Automatically schedule or un-schedule a selected job
Interactive Scheduler Zoom option Non working time Move timeline Schedule jobs Information on selected job in Gantt chart Jobs list for the selected resource Resource List
Manual Scheduling Action on individual scheduled job Moving job through drag and drop or can be drawn on Gantt window While moving job, if there is violation, provides an alert
Upstream and Downstream Links Show upstream and downstream links for selected customer order or job order