Lecture 3. Sewing Department. Reports…. Hourly Production Report Daily Production Report Daily Quality Report Major Faults Report Sewing Order Report. Sewing Calculations…. After Wash Measurements Production Run? # of machines SMV? Yield? DHU Efficiency at all levels

jens
Download Presentation

Lecture 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lecture 3 Sewing Department

  2. Reports… • Hourly Production Report • Daily Production Report • Daily Quality Report • Major Faults Report • Sewing Order Report

  3. Sewing Calculations… • After Wash Measurements • Production Run? • # of machines • SMV? • Yield? • DHU • Efficiency at all levels • Time Wastage

  4. Sewing Calculations… Before Wash Measurements = After Wash Measurements + Shrinkage Production per day = (Shift time (min) X # of machines / SMV) # of machines required = (Required Quantity X SMV / Shift Time) DHU = (Total # of defects / Total # of units inspected) X 100 Efficiency = (# of units produced / Target units) X 100 Time Wastage = (Shift Time (min) X Efficiency %) / 100

  5. Sewing Calculations… Production Run = (Order Quantity X SMV) / (Shift Time in minutes X # of machines) Yield = (# of units produced / Target units ) X 100

  6. Outputs • Stitched Garments • Sewing order report • Wastages