An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNR NEES Training Workshop:“Shake-Table Testing”

  2. Welcome to NEES@UNR • A multiple shake-table research facility • Standard description of the facility capabilities… • NEES Equipment: • Three Biaxial Shake-tables (two horizontal axes) • One Biaxial Shake-table (one horizontal + one vertical) • Data acquisition system • Telepresence: cameras, etc • Non-NEES Equipment: • Actuators • Modular/reconfigurable reaction blocks/walls

  3. Purpose of the Training Workshop Learn about what is involved in: planning, preparing and conducting a shake-table experiment

  4. Workshop Program: Day 1 • Overview of dynamic testing methods: Pseudo-dynamic testing, Shake-table testing, Real-time hybrid testing • Overview of NEES shake-table facilities: Components and specifications • Test specimen: Dimensional analysis, similitude, modeling and computational simulations • Example case studies: In-class group activity I – Designing a scaled-model of a building

  5. Workshop Program: Day 1 (cont’d) • Test planning: Specimen design, construction, material and sub-assembly testing, Computational simulations, Input base excitations: Generated artificial and/or historically recorded, System tuning and ambient vibrations • Data acquisition and instrumentation: Brief • Test protocol: Introduction; detailed coverage next day

  6. Workshop Program: Day 2 • Test protocol: Implementation; System identification: White Noise, Sine Sweep, Snap-back • Input base excitations: Generated artificial and/or historically recorded, Low-level excitations, Incremental testing to “failure” • Data acquisition and instrumentation: Closer look • Data types, processing/reduction, analysis, error • Laboratory group activity I

  7. Workshop Program: Day 3 • Laboratory group activity II – Construct, instrument and test your specimen • Workshop post-mortem and feedback