An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISYE 6202: Increasing Efficiency at FASTENAL Distribution Center BY NISHANT S JAIN (MS IE Georgia Tech)

  2. AGENDA • Overview • My Roles & Responsibilities • Facility Layout • DC Operations • Sortation Overview • Optimal Scheduling • Lean 5S • Picking • Slotting • Replenishment • Cycle Counting • Summing It up

  3. OVERVIEW • # 2 Industrial and Construction supplier in North America (#1 being W.W. Grainger) • ~$ 3 billion in sales (2010) & growing at 20% per qtr • 2400+ stores and 14 RDCs in the US • Owns 5000 Trucks, dry vans, sprinter vans • Provides Value Added Services to customers - bin- stocking programs, JIT/kanban systems, point-of-sale vending • Range of Products: • Fasteners (nuts, screws, bolts,etc..) • Chemicals, paint, liquids, office products • Tools, electrical and construction supplies • Automotive, motors, safety equipment

  4. MY ROLES & RESPONSIBILITIES • Job title: DC Efficiency Analyst • Basically an internal Warehouse consultant • Also, Lean 5S responsibilities and Kaizen events • But first…….I had to prove myself ! • Started work in the Sortation department - Lean the department – Visual Aids, 5S, Optimal Scheduling - Performance Measurement system - Incentive programs • New system for Picking • Changes in cycle counting • Slotting and Replenishment improvements

  5. FACILITY LAYOUT Overstock Storage (Pallet Racks + Floor Storage) Pick module (3 levels) Forward pick area Floor Storage + Rod shelving CONVEYOR SYSTEM Large Parts & Small parts Sortation. (2 levels) Packaging & Receiving ( 2 levels) Receiving & Shipping • FACILITY PROFILE • ~ 200, 000 sq. feet • Serves 250 stores + Other HUB • transfers as part of Company wide • Inventory Re-distribution • Extensive use of conveyors often • making it the bottleneck.

  6. DC OPERATIONS • Receiving happens early in the morning (5 days/wk) • Sortation divided into Large Parts & Small Parts • Sorter sorts directly for cross-transfer • Sorter sorts for replenishing DC inventory (IB) • Sorter sorts customer orders (OB) • Sortation runs from early morning to late evening • Picking happens in a 6-8 hr window as most order pickers (~80%) work Part Time (hence can only work 5 hrs/day) • Shipping happens late in the night • Inventory checks happens late in the night to avoid interference • Replenishment occurs early in the morning before Picking 5 AM 10 AM 8-9 PM 1 AM RECEIVING + REPLENISHMENT SORTATION SHIPPING + CYCLE COUNT PICKING 11 AM 7 PM

  7. SORTATION OVERVIEW • Small group of employees (~ 18) mostly part time ( <= 30 hrs/week) • Product damages and Quality the biggest concern • Similar HUB is better than us in production and efficiency ( they were doing more work with fewer workers hence at a lesser cost)

  8. OPTIMAL SCHEDULING • Tried formulating a LP and IP. • Failed as too many constraints – worker speeds, worker times ( their schedules), part time employees hence allowance of 5 hrs, no account for buffers • INSTEAD, Excel Spreadsheet used to plan schedules based on production speed vs. demand formula • Intuitive for the manager • Changes to schedule easy • Accounts for buffer • and high variability Forecasted Load Using Moving Weighted Average

  9. LEAN 5S Figure: 5S Implemented Figure: 5S Meaning Horribly disorganized and scattered. Space wastage apparent All boxes kept in a corner to save space and properly organized

  10. LEAN 5S WASTESIN THE SYSTEM • Unclean environment – spills, plastic, dirt on the floor • Tough conditions ( 120 F during summer) with 6 fans cooling 50000 sq. feet • Incorrect stacking methods was causing damages to products • Conveyor belt causing huge bottlenecks • Performance Measurement based on theoretical standards. • Team based incentive was not working MEASURES TAKEN • Cleanliness became a priority – HIGH 5s incentive program. Free Lunch for Individuals keeping the area clean. • Setup 12 fans before I left • 1 employee dedicated to stacking audits & quality • Individual Performance Measurement System based on scans/hr (speed) and discrepancies (quality)

  11. PICKING • PICK CHARACTERISTICS • 3 floors of the pick module (9000 SKUs) • Bottom floor for fragile and small items ( Slow pick rate) • Use of Bar Code readers • Follows ABC ranking: 30% of the SKUs contribute 65% of the picks • Pickers start from 9 AM – 7 PM; Changed it to 12 – 6 PM • ( Consolidated pick window) • Picks are downloaded every 2 hours in the system starting at 6 AM. Emergency picks up to 5 PM • Workers walk towards each other while picking starting at the ends. (zig-zag path) • Manager re-distributes workers based on work content 3 – level The GAP warehouse

  12. PICKING • Disorganized picking (workers starting at will) and lack of discipline • Remember: Consolidated Picking window. i.e. orders are allowed to build before order pickers arrive • Implemented Bucket brigades • Instantly saw about 40 - 50% improvements in CF and PF. • About 10% in Shelving • But after 7 – 10 days, picking returned to almost normal though slight increase in picking ( 5-10%) • Spike was due to end of quarter (highest sales volume in the year) • Did not work due to very few downloads every 2 hours • But it instilled a team based culture, organization and competition. Figure: Bucket Brigades at work

  13. SLOTTING • Workers break their backs while picking from the lowest or top most shelf of the rack (No GOLDEN ZONE) • Equal Space Allocation • Follows ABC distribution: 20% of the SKUs contribute 65% of the picks and nearly dollar sales as well. • Focus on getting the 2000 SKUs in Carton Flow and Pallet Flow • Use of Slotting software from warehousing-science.com • But Problem !! No data on Carton sizes + time of internship ending • Measured 2000 SKUs in about 30 hours in 3 levels of PF and CF ( Inventory check !!) • Use of Greenfield Approach • Considered 3 levels of storage: - PF -CF - Infinite (Shelving) • Storage in optimal quantities could potentially increase picking productivity by 20%

  14. REPLENISHMENT • Current operations – 50% of Max limit triggered replenishment (1 pallet load in PF OR 6 cartons in CF triggered replenishment from Overstock) • Effects of this policy ( consider the following in Pallet Flow ) • Proposed the 14 days of supply method for replenishment • However it was unsuitable for Pallet Flow. • Suitable for Carton Flow (Few PF SKUs can be re-assigned their Min/Maxes)

  15. CYCLE COUNTING • Current Method Cycle Count 35000 SKUs thrice a year @ 105,000 SKU counts + Everyday random counts - Proving to be highly ineffective - Also performed analysis of current errors ( mostly “B” items) • Improved Method – Ranked based ABC method Items responsible for the first 80% of COGS - Ranked "A" (5 times/yr) Items responsible for the next 15% of COGS- Ranked "B" (4 times/yr) Items responsible for the next 4% of COGS - Ranked "C" (3 times/yr) Items responsible for the last 1% of COGS  - Ranked "D“ (2 times/yr) - Total of 55,000 SKU counts • Savings of 50,000 SKU counts • Increased accuracy !

  16. SUMMING IT UP “ A warehouse is not for the weak- hearted…. You really need to want to do this….If you do….it’s what you’ll call home !” - Manager @ Fastenal • During the last few days of the quarter when business was at its peak, we had a crises moment (workers did not show up and departmental manager left in Picking)We worked 10 AM to 1 AM …though next day treated to Beer & Pizza by the DC Manager ! • Applied warehousing-science (Global Logistics Scholar) in practice. Results were UNBELIEVABLE ! A BIG THANK YOU TO DR. BARTHOLDI and MR. PETE VIEHWEG

  17. THANK YOU Contact: Nishant Jain 404.9633495 njain37@gatech.edu