PROJECT OVERVIEW. Peter Hansen 734-763-6241 pehansen@umich.edu. System Requirements. L-band NEDT: < 0.1 K desired, < 0.5 K required Absolute calibration: < 2 K desired, < 3 K required Linear dynamic range: 5 K < Tb < 300 K Ambient operating temperature range: -30 o C < To < +40 o C

jeri
Download Presentation

Peter Hansen 734-763-6241 pehansen@umich

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT OVERVIEW Peter Hansen 734-763-6241 pehansen@umich.edu

  2. System Requirements • L-band NEDT: < 0.1 K desired, < 0.5 K required • Absolute calibration: < 2 K desired, < 3 K required • Linear dynamic range: 5 K < Tb < 300 K • Ambient operating temperature range: -30o C < To < +40o C • Unpowered survival temperature range: -50o C < To < +60o C • Across-track scan width: ±35o • Synthesized half-power beamwidth: < 15o desired, < 22orequired • Onboard uninterrupted data storage for 3 hours • In-flight “Data OK” indication for pilot • TIR profiles – by synthesized beam desired, nadir required • Instrument provides flightline guidance, location, and attitude • Field maintainable, 2 month MTBF

  3. System Implementation • System Designed to Interface with Aviat Husky Model A-1B aircraft • L-band Synthetic Thinned Array Radiometer (STAR) • Direct Sampling Digital Radiometer (DSDR) technology • Two major hardware modules • Sensor Module • Antennas, Receivers, Calibration Sources, Thermal Control, Timing & Data Sample Control • Control Module • Control Computer, Filter/Correlator,System I/O,Data Storage, Heat Exchanger, Power System • In-flight calibration sources - two widely spaced temperatures • Simple pilot/operator interface • On/Off power switch and power monitor • System ready, Data OK lights • On board raw data storage • Data analysis performed off-line • GSE • PC Laptop for offline data analysis, calibration • Shipping Containers • Handling Fixtures • Truck Boom Adapter

  4. System Block Diagram

  5. Hardware Tree

  6. Technical Challenges • Tight Receiver Thermal Control Requirement • Temperature stability ~11 milli-degrees K during 1.5 sec integration period • Wide environmental operating temperature = -30 to +40 deg C • Rapid environmental temperature change from takeoff to cruise altitude • Tight Electrical Power Budget • Total available 12 Volt power = 400 Watts max, 300 Watts average • Receiver=100W, Thermal Control=100W, Control Module=200W • EMI/RFI • Small Aircraft Power System & Avionics • ECL electronics at VHF clock rates • Calibration • Absolute temperature accuracy <2 deg K

  7. Project Plan • Development Phase - 2 Channel Prototype • Includes both Calibration sources - Diode (warm) and Cold • 2 Complete Receivers • LNA and Analog Filter evaluation • Cal source switching evaluation • A/D converter, system timing, digital signal processing evaluation • 10 Channel Thermal Control Prototype • Two active receivers, 8 resistive thermal simulators • PID controller evaluation • Prototype Control Computer Assembly • Early software development tool • High speed communications interface verification

  8. Project Plan • Implementation Phase - 10 Channel Flight System • Fab and Test flight components • Integrate components • System Module testing - (Sensor Module, Control Module) • Use Prototype hardware for test support of flight modules • Continue software development • System Integration, Test and Calibration • GSE Fabrication • Mechanical fixtures and truck boom adapter • Field EGSE - power cart, pre-flight data analysis software • Flight Test Phase • Aircraft Integration • Flight Calibration • Field Evaluation

  9. Schedule

  10. Prototype Development Plan • Stage 1 - Two parallel activities • Thermal Control System • Cold Plate, 10 Control Plates, Heat Exchanger, Plumbing • “Slow” versions of Receiver DA Board, Sensor Control Board • “Slow” version of PC104 Controller • Prototype Harness and Wiring • Thermal Control Software Development • Receiver RF System - 2 RF channels & Calibration Equipment • RF amplifiers, filters, and switch • Diode Noise Source & Dividers, Cold Cal Source • RF Characterization testing • Continued module thermal characterization

  11. Prototype Development Plan - contd. • Stage 2 • Thermally controlled receiver • “Fast” version of Receiver DA Board, Sensor Control Board • “Fast” version of PC104 Controller • Integrated Receiver Tests • Signal Processing Software Development • Environmental temperature test • End to End Receiver Evaluation • Flight Hardware Design updates