UNC VMware Environment. UNC VMware. Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with reseller, Zunesis Zunesis assessment – Executive summary Technical Roadmap Total Cost of Ownership Return on Investment
E N D
UNC VMware • Microsoft Windows 2003 (145 physical servers) • HP hardware - Server and SAN infrastructure • Developed a partnership with reseller, Zunesis • Zunesis assessment – • Executive summary • Technical Roadmap • Total Cost of Ownership • Return on Investment • Bundled cost into other approved projects and utilized IT one-time dollars to fund. CHECO Presentation
UNC VMware • UNC VMware Environment • 3 HP C7000 Blade Chassis: • 4 HP Virtual Connect Modules for Networking • 2 HP Virtual Connect Modules for Fiber • Redundant paths for networking and fiber • Currently 10 Blades with ESX 3.5 Update 2 • Each Blade has: • 2 AMD 2.8GHz • 16GB Ram • 1 NIC for Management • 1 NIC for Vmotion • HP EVA 4100 Configuration – EVA 4400 for E-Fort: • LUNs are kept at 300GB • 8 to 10 VMs per LUN • Multiple paths • Every ESX host has access to every LUN CHECO Presentation
UNC VMware • Current status • 34 production servers (24 migrated from Physical to Virtual) • 12 test servers • Services running in UNC VMware production environment • https://Beardrive.unco.edu • http://emergency.unco.edu (out of E-Fort) • SoftGrid (Application streaming) • Campus printing services • DHCP • ResNet registration process (Cisco Network Registrar) CHECO Presentation