1 / 26

MCAGCC TWENTYNINE PALMS AIRSPACE EXPANSION

MCAGCC TWENTYNINE PALMS AIRSPACE EXPANSION. March 2012. AN UNDERSTANDING…. Approximately 67% of Domestic Special Military Use Airspace falls within the Western–Pacific Area More Than 50% of ZLA Airspace is SUA ZLA/FAA has multiple customers to accommodate with available assets and airspace.

jerrycsmith
Download Presentation

MCAGCC TWENTYNINE PALMS AIRSPACE EXPANSION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MCAGCC TWENTYNINE PALMSAIRSPACE EXPANSION March 2012

  2. AN UNDERSTANDING… • Approximately 67% of Domestic Special Military Use Airspace falls within the Western–Pacific Area • More Than 50% of ZLA Airspace is SUA • ZLA/FAA has multiple customers to accommodate with available assets and airspace Date: XX February 2012 2

  3. AN UNDERSTANDING… • With careful consideration of all airspace users, the Marine Corps has developed an airspace proposal that meets our training requirements with the least impact to the National Airspace System (NAS) • Based on public comment and informal negotiations and meetings with ZLA management, the Marine Corps has drastically reduced the original airspace proposal Date: XX February 2012 3

  4. PROPOSED SPECIAL USE AIRSPACE Date: XX February 2012 4

  5. PROPOSED SPECIAL USE AIRSPACE Date: XX February 2012 5

  6. PROPOSED RESTRICTED AREA 25XX EAST/WEST • Proposed area size has been reduced to remain clear of V 8/21 • Times of use and altitudes have been reduced to use of both East and West only during MEBEX; and only the East for MEBEX work- ups. Date: XX February 2012 6

  7. PROPOSED RESTRICTED AREA 25XX EAST/WEST • R-25XX East – From surface to FL 180 for up to 12 hours per day for up to 28 days per year. • R-25XX East – From surface to FL 270 for up to 24 hours per day for 6 days per year • R-25XX East/West – From surface to FL 400 for up to 12 hours per day for 6 days per year (not to exceed 40 hours per year). Date: XX February 2012 7

  8. PROPOSED RESTRICTED AREA 25XX EAST/WEST Date: XX February 2012 8

  9. PROPOSED RESTRICTED AREA 25XX EAST/WEST Date: XX February 2012 9

  10. PROPOSED JOHNSON VALLEY (JV) MOA/ATCAA • Proposed area size has been reduced to remain clear of V 386 • Times of use and altitudes have been reduced to include only the MEBEX and MEBEX work- ups Date: XX February 2012 10

  11. PROPOSED JOHNSON VALLEY (JV) MOA/ATCAA • From 3000 feet AGL to FL 180 for up to 12 hours per day for up to 28 days per year • From 3000 ft to FL 270 for up to 24 hours per day for 6 days per year • From 3000 feet AGL to FL 400 for up to 12 hours per day for 6 days per year (not to exceed 40 hours per year) Date: XX February 2012 11

  12. PROPOSED JOHNSON VALLEY (JV) MOA/ATCAA Date: XX February 2012 12

  13. PROPOSED SUNDANCE MOA/ATCAA • Proposed area remains clear of all airways Date: XX February 2012 13

  14. PROPOSED SUNDANCE MOA/ATCAA • From 1500 feet AGL to 10,000 feet MSL intermittently via NOTAM • From 1500 feet AGL to FL 180 up to 12 hours per day for up to 28 days per year • From 1500 feet AGL to FL 270 up to 24 hours per day for up to six days per year • From 1500 feet AGL to FL 400 for up to 12 hours per day for 6 days per year (not to exceed 40 hours per year Date: XX February 2012 14

  15. PROPOSED SUNDANCE MOA/ATCAA Date: XX February 2012 15

  16. PROPOSED BRISTOL MOA/ATCAA • Airspace boundaries remain unchanged • MOA floor dropped from 5000 ft to 1500 ft and ATCAA ceiling raised to FL 400 during MEBEX Date: XX February 2012 16

  17. PROPOSED BRISTOL MOA/ATCAA • From 5,000 feet MSL to FL 220 from 0700-1500 Monday-Friday; other times by NOTAM • From 1500 feet AGL up to FL 270 for up to 24 hours per day for 6 days per year • From 1500 feet AGL to FL 400 for up to 12 hours per day for 6 days per year (not to exceed 40 hours per year) Date: XX February 2012 17

  18. PROPOSED BRISTOL MOA/ATCAA Date: XX February 2012 18

  19. PROPOSED CAX HIGH/LOW MOA/ATCAA • By dividing the proposed CAX MOA /ATCAA into Low (1500 ft – 8000 ft) and High (FL180 – FL400) air traffic is provided a North/South corridor V 514/536 • Times of use have been reduced to include only the MEBEX (6 days per year) Date: XX February 2012 19

  20. PROPOSED CAX HIGH/LOW MOA/ATCAA • CAX Corridor High MOA/ATCAA – From FL 180 up to FL 270 for up to 24 hours per day for 6 days per year • CAX High Corridor MOA/ATCAA – From FL 180 to FL 400 for up to 12 hours per day for 6 days per year (not to exceed 40 hours per year) • CAX Low Corridor MOA – From 1500 feet AGL up to 8000 feet for up to 24 hours per day for 6 days per year • CAX Low Corridor MOA – From 1500 feet AGL up to 8000 feet for up to 12 hours per day for 6 days per year Date: XX February 2012 20

  21. PROPOSED CAX HIGH/LOW MOA/ATCAA Date: XX February 2012 21

  22. PROPOSED TURTLE A/B/C MOA/ATCAA • Original Turtle MOA airspace boundaries and times of use are unchanged =Turtle A MOA/ATCAA • Turtle B (FL220 – FL400) and Turtle C (1500 ft – 11,000 ft) cover the Western half of the area and are only active during MEBEX • Lake Havasu Airport is no longer impacted and V 135 between PARKER and NEEDLES is available Date: XX February 2012 22

  23. PROPOSED TURTLE A/B/C MOA/ATCAA • Turtle MOA/ATCAA A – From 11,000 feet MSL to FL 220 from 0600-1600 Monday-Friday; other times by NOTAM • Turtle MOA/ATCAA B and C – From 1500 feet AGL to FL 270 for up to 12 hours per day for 6 days per year. (Turtle MOA/ATCAA A will also be active 11,000 ft to FL 220 during these times) • Turtle MOA/ATCAA B and C – From 1500 feet AGL to FL 400 for up to 12 hours per day for 6 days per year (not to exceed 40 hours per year). (Turtle MOA/ATCAA A will also be active 11,000 ft to FL 220 during these times) Date: XX February 2012 23

  24. PROPOSED TURTLE A/B/C MOA/ATCAA Date: XX February 2012 24

  25. SUMMARY • This airspace proposal represents the Marine Corps’ best effort to provide a viable solution to a complex initiative. • It implements significant changes recommended by the FAA, and institutes further changes in consideration of comments received during scoping meetings with the public • Request the FAA’s support in this matter Date: XX February 2012 25

  26. QUESTIONS? Date: XX February 2012 26

More Related