An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Approval Procedure CSOC 11 June 2003 Code approval procedure PKF

  2. Approval of CERN code • Safety Policy at CERN 2003 (SAPOCO42; 3.2) • Preliminary draft from group of specialists • Consultations (Divisions, DSOC, Staff Assoc,...) • SAPOCO examination • Adoption by SAPOCO • Submitted to the Director-General • Translation and publication Code approval procedure PKF

  3. Elaboration of cryo code • Cryogenics Officers and the csoc initiated to take care of Safety in matters of cryogenics, in particular to establish rules for this discipline. • Main documents at the start of the CSOC: • IS47 "The use of cryogenics fluids (1998)" • code D2 - "Safety code for pressure vessels and pressurized pipelines (1998)" Code approval procedure PKF

  4. Elaboration of cryo code • A working group under the CSOC became active in the spring 2002 with the members: • Marc Vadon/TIS, Chair • Claude Margaroli TIS • Goran Perinic LHC-ECR • Poul Frandsen, CSOC chair. Code approval procedure PKF

  5. Elaboration of cryo code • The working group felt that a code for 'Cryogenic Equipment' was urgent, • More urgent than a Cryogenics Safety Manual. Code approval procedure PKF

  6. Elaboration of cryo code • CSOC 5 Nov 2002 • CSOC 11 June 2003 • Consultations (DSOC, AT division groups, TIS, Staff Association) • Use EDMS for comments? • Presentation to SAPOCO Code approval procedure PKF

  7. Key points • The generic reference texts: • European agreements (e.g. ADR) • European Union directives • Construction standards and codes (EN, ISO, IGC, CGA) • CERN regulations (Codes, IS). Code approval procedure PKF

  8. Key phrases • … vessels must be designed in accordance with the applicable European Standard, p.t. EN13530. Code approval procedure PKF

  9. Key phrases • Special equipment must comply with standards and codes. Further it must fulfil additional requirements set out by TIS. Code approval procedure PKF

  10. Reaction CSOC Nov 2002 • Start with examples of special equipment • Cold- or valve box, sc cable test rig, cryoline… • Include all cryogenic facilities (ref. IS47): • Vacuum pumps, water supply, compressors, level gauges, atm. T storage tanks … Code approval procedure PKF

  11. Reaction CSOC Nov 2002 • 6.2 Design file timing error • Specification committee, NO, not always there • TIS specialist? • Simulation of the use of code to existing examples • There is a need for a cryogenic safety manual further to the code. Code approval procedure PKF