150 likes | 375 Views
Years after the eruption of Mt. Pinatubo in June 1991, the Chamber of Furniture of the Philippines (CFIP –Pampanga Chapter) has initiated the establishment of Pampanga Furniture City Project to support the furniture manufacturers rise above these ruins. Pampanga Furniture City.
E N D
Years after the eruption of Mt. Pinatubo in June 1991, the Chamber of Furniture of the Philippines (CFIP –Pampanga Chapter) has initiated the establishment of Pampanga Furniture City Project to support the furniture manufacturers rise above these ruins.
Pampanga Furniture City • To assist CFIP – Pampanga members in high risk and • medium risk areas in relocating to safer areas; • To preserve and secure the various asset like machinery and equipment; • To ensure continuous and strengthened livelihood of • furniture workers of affected firms; • To generate job opportunities for the lahar victims in the • resettlement area; • To protect a strong furniture industry presence in the • province.
Needs Assessment Furniture City Sta Lucia Resettlement Madapdap Resettlement
Furniture City Location Map
TECHNO CENTERS 1992 • Botolan Techno Center in Zambales • Hermosa Techno Center in Bataan • Porac, Mexico, and Floridablanca Techno Center in Pampanga • Capas and Concepcion Techno Center in Tarlac • (39 bldgs @ 1,260sqm)
TECHNO CENTERS 1992 Construction Progress Completed 1,260 sqm bldg
TECHNO CENTERS 1996 • Mabalacat TC Phase I in Pampanga (12 bldgs @ 1,440sqm) 1997 • Mabalacat TC Phase II in Pampanga (18 bldgs @ 1,350sqm)
TECHNO CENTERS 1996 Mabalacat Construction Progress
TECHNO CENTERS 1997 Mabalacat Phase I Completed
Support Facilities Botolan/Porac/Floridablanca/ Mabalacat TC Hermosa/Mexico/Concepcion/Capas • w/ Administration Bldg • 2 elevated water tank • Basketball Court • Three Phase Power Lines • Digitel land line, SMART wireless Internet • Water distribution system • Concrete Road and Drainage network • w/ Administration Bldg • Three Phase Power Lines • SMART wireless Internet • Water distribution system • Concrete Road and Drainage network
Botolan • Hermosa • Porac • Floridablanca • Mexico • Concepcion • Capas Typical Admin Bldg
Mabalacat TC Size:1,440 and 1,350 sqm
As of Present • 32 locators • 48 buildings occupied • 70% occupancy rate • With new and improved lease rates plus additional incentives to locators, TRC targets an 80% occupancy rate for 2008