180 likes | 192 Views
This project involves stabilizing the drain pipe structure with gas cylinder supports. Options include cutting the existing structure, leaving enough space for access, fusing both structures, or mixing the concept of supporting structures. The structure stays on the concrete, with blocked cable trays and a reinforced false floor structure.
E N D
ST0985279_02 BA6
Drain Pipe Stabilising structure AUG Gas cylinders supports BA6
Move AUG to the right • Cut the existing structure to free enough space for the SS Option 1 BA6
Leave enough space to access the pipe Option 1 BA6
Fuse both structures Option 1 BA6
Option 1 BA6
Mix the concept of the supporting structure using the existing one Option 1 BA6
Structure stays on the concrete • Cable tray blocked • Allowable Load 0,4kN/m2 • False floor structure to be reinforced? Option 1 BA6
Option 2 BA6
Option 2 BA6
Option 2 In front of the structure BA6
Option 2 BA6
Structure stays on the concrete • Cable tray blocked • Allowable Load 0,4kN/m2 • False floor structure to be reinforced? Option 2 BA6