2016 AML Reclamation Grading Costs • 6 reclamation projects with 1,728,269 total cubic yards • Cost per cubic yard ranged from $0.62 to $2.25 • 3 low bid averages at $0.91, $1.06, and $1.16 for a weighted average of $1.03 • 2014 – 2016 weighted average at $0.95 for 500 ft. or less
2016 AML Reclamation Revegetation Costs • 9 reclamation projects with 284.8 acres revegetation • Cost per acre of the 3 lowest bids ranged from $808.63 to $2,838.65 • Weighted average of 3 lowest bids was $2,129.80
2016 AML Reclamation Mulch, Seed Bed Preparation and Seed Costs • Mulch cost per acre of 3 lowest bids was $886.72 • 3 year weighted average of Mulch cost is $868.05 • Seed Bed Prep cost per acre of 3 lowest bids at $329.10 • 3 year weighted average of Seed Bed Prep is $279.57 • Seed cost per acre of 3 lowest bids at $250.95 • 3 year weighted average of Seed is $281.85
2014-2016 Bond Rate Data 2017 Bond Rates
2014-2016 Bond Rate Data 2017 Bond Rates (continued)