130 likes | 350 Views
Köksal Holding. MAIN STEPS FOR A NEW HOSPITAL. PLANING OF THE PROJECT PREPARING FIZIBILITY PROJECT DESIGN DEVELOPMENTS AND RESULTS. A. THE PLANNING OF THE PROJECT. DEPARTMENTS AREAS HUMAN RECOURSES MEDICAL EQUIPMENTS NON MEDİCAL EQUIPMENTS. PLANING DEPARTMENTS.
E N D
MAIN STEPS FOR A NEW HOSPITAL • PLANING OF THE PROJECT • PREPARING FIZIBILITY • PROJECT DESIGN • DEVELOPMENTS AND RESULTS
A. THE PLANNING OF THE PROJECT • DEPARTMENTS • AREAS • HUMAN RECOURSES • MEDICAL EQUIPMENTS • NON MEDİCAL EQUIPMENTS
B. FIZIBILITY • DETERMINATION OF INVESTMENT AMOUNT • DETERMINATION OF OPERATING COSTS • INCOME AND EXPENSE ANALYSIS OF RESOURCES • DEPARTMENTSINCOME AND EXPENSE PLANNING • BREAK EVEN POINT AND PROJECT NPV
C. PROJECT DESIGN • ARCHITECTURAL PROJECT DESIGN 1/100 1/50 and 1/20 AND SOMETIMES 1/1 • ELECTRIC WATER CONDITIONING AND OTHER DESIGN studies • APPLICATION PROJECTS • IMPLEMENTATION PLANS • START WORKS • AUDIT AND CONTROL • RESULTS
D. DEVELOPMENTS AND RESULTS • MAKING PURCHASING PLANS • PREPARATION OFTECHNICAL SPECIFICATIONS • PLANNING OF PURCHASE AND DELIVERY TIMES • ORDERING to PASSED • INSPECTION-CONTROL - ADMISSION AND COMPLETION • LAST CONTROLS BEFORE BEGINING JOBS • ACCEPTING PATIENTS