An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radio Grounding for Lightning Protection? (The “electrical safety ground” and an “RF ground” are not effective as a lightning ground.)

  2. 50% -18,000+ amps 10% - 65,000+ amps 1% - 140,000+ amps Voltages easily exceeding 100 KV+ Avg near 50 thunder-storms/yr MN-WI Often 2 or 3 strokes per strike What are we dealing with?

  3. Charge in cloud ionizes area beneath “Leader” extends as air breaks down path Multiple leaders inter-connect approaching opposite polarity of earth As charge increases, “upward seeking leader” extends toward the approaching step When leaders connect, huge currents flow Polarity usually positive How does “lightning” strike?

  4. “A lightning strike can really mess up your day” ………. K0KFC

  5. Think AC • A lighting strike has predominant AC components, hence inductance (L) and impedance (Z) are primary considerations. • Main components are 1- 2 Mhz and higher.

  6. Start with Single Point Ground Bar • All metallic chassis direct connected to SPGB • Includes transceivers, rotor controls, TV, telephone, racks, computer, everything • Must have low inductance (L) paths • Accomplishes common bonding • Power cord 3rd wire “ground” of little value

  7. Coax Protectors • Each coax must have coaxial feed thru arrestor. • DC continuity vs DC blocked • Gas tubes? (single vs multi-electrode) • Protector placed as close to transceivers as possible • Well grounded at SPGB • ¼ Wave Stub must be low Q to minimize “ringing” (Usually very little effectiveness)

  8. Rotor Cables, Tel lines, Relay control boxes • MOV (Metal Oxide Varistors) • Well grounded • Clamp rotor lead during voltage rise • Metal enclosure • MOV must have short lead length

  9. Establish Perimeter Ground Field • Minimum 8 foot rod length (1/2” or 5/8”) • Interconnect w/ #4 AWG minimum • 2” copper strap desirable (min L) • Rod spacing X2 its length (16’ min) • Exothermic bonds most desirable • Plan perimeter field w/duck foot radials

  10. Ground Field (con’t) • Interconnected ground rods become energy dissipation system • How many ground rods? • Common bonds to electrical safety ground and metallic water • Provide low L path to direct energy away from the shack • How many ohms? XL? L? R?

  11. TowersGuyed vs Self-Supporting? • Properly grounded guy wires place added low L paths in parallel with tower L resulting in overall lower impedance • Locate tower 20’ minimum from shack to minimize EM flashover • Tower leg joints not a concern • Ufer ground is useful as a part of the overall system (less effective when used alone)

  12. Towers (con’t) • Be aware of corrosion issues • All dis-similar connections isolated with stainless steel hardware • Use joint compounds (protective coatings) • Ground ALL coax sheath at both top and bottom of tower • Bring coax off at very bottom of tower to minimize voltage divider effect

  13. Towers, (con’t) • Orient copper strap broadside to tower to minimize mutual coupling • No sharp bends anywhere (>2”) • Avoid scratching off galvanized coatings

  14. AC Power Considerations • Surge Protection (TVSS) at main entrance service panel • TVSS should be physically closest to main breakers in panel • Interconnect electrical ground with tower and perimeter ground fields • Run power in grounded metallic conduit to shack to minimize inductive flashover

  15. AC Power, (con’t) • Surge protectors on all devices at the operating desk • Minimize AC cord lengths (Cut to length) • NO cheapie plastic (K-mart specials) power strips (fire hazzard) • Power strip must have robust metal enclosure to minimize fire hazzards

  16. TVSS

  17. Two more observations….. • The arc/flashover resulting from an un-controlled medium sized lightning strike is hotter than the surface of the sun. • Never operate when you can hear thunder or see lightning flashes. (Grounding is intended to protect equipment, not operator.)

  18. References/Questions? • www.polyphaser.com • Lightning Protection code NFPA 780 • www.harger.com • www. arrl.org/tis/info/lightning.html