1 / 12

Research Partnership to Secure Energy for America

Research Partnership to Secure Energy for America. RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted: 4 March 2009 Accompanying Uploaded Files: MS Project File “07121-1701 – Baseline Project Management Plan – 4 Mar 09.mpp”

joel-ayers
Download Presentation

Research Partnership to Secure Energy for America

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted: 4 March 2009 Accompanying Uploaded Files: MS Project File “07121-1701 – Baseline Project Management Plan – 4 Mar 09.mpp” Excel Spreadsheet “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

  2. KR Organization Chart

  3. Key Members Contact Information • Art Schroeder - RPSEA Manager – Deepwater Technology & Commercialization 1650 Highway 6, Suite 300 Sugar Land, TX 77478 Phone: 281-690-5506 Email: ArtSchroeder@RPSEA.org • Wiley H. Wells - Contract Director - Research Partnership to Secure Energy for America 1650 Highway 6, Suite 300 Sugar Land, TX  77478 Office:  (281) 313-9555 Direct:  (281) 690-5504 Fax:  (281) 313-9560 Email: wwells@RPSEA.org • Dave Rees - VP – Marketing & Business Development 1800 West Loop South – Suite 1000 Houston, TX 77027 Phone: 713-595-5131 Email: drees@knowledge-reservoir.com • Dave Crossley - RPSEA DW GOM Project Director 1800 West Loop South – Suite 1000 Houston, TX 77027 Phone: 713-401-5321 Email: dcrossley@knowledge-reservoir.com

  4. Key Members Contact Information (continued) • Frank H Lim Senior Reservoir Engineering EOR Advisor Anadarko Petroleum Corporation 1201 Lake Robbins Drive The Woodlands, TX 77251 Office: 832-636-3010 Mobile: 832-797-7589 Email: frank.lim@andarko.com • Dandina N. Rao, Ph.D. - Distinguished Professor Louisiana State University 3516 CEBA Building Baton Rouge, LA 70803 Phone: 225-578-6037 Email: dnrao@lsu.org • Mayank Tyagi, Ph.D. – Assistant Professor Louisiana State University 209 Johnston Hall Baton Rouge, LA 70803 Office: 225-578-6041 Email: mtyagi@lsu.edu

  5. Key Members Contact Information (continued) • Gene Narahara Chevron Energy Technology Company 1500 Louisiana Street Houston, TX 77002 Phone: 832-854-3754 gmna@chevron.com • Walt Bozeman Team Leader - Gulf of Mexico Exploration Engineering BP American Inc. 200 Westlake Park Blvd. Houston, TX 77079-2663 Phone: 281-366-0801 Email: walt.bozeman@bp.com • James Sheng, Ph.D. Research Reservoir Engineer Total E&P Research & Technology USA, LLC 1201 Louisiana, Suite 1800 Houston, TX 77210-4397 Phone: 713-647-3603 Email: james.sheng@total.com • David J Kihneman P.E. New Field Developments – GOM Deepwater Anadarko Petroleum Corporation Phone: 832-636-3883 Email: david.kihneman@anadarko.com

  6. Key Members Contact Information (continued) • Joe Lach - Senior VP – Subsurface Consulting Knowledge Reservoir 1800 West Loop South – Suite 1000 Houston, TX 77027 Phone: 713-595-5128 Email: jlach@knowledge-reservoir.com • Gavin Longmuir – RPSEA Sr. Project Engineer Knowledge Reservoir 1800 West Loop South – Suite 1000 Houston, TX 77027 Phone: 713-401-5304 Email: glongmuir@knowledge-reservoir.com

  7. RPSEA 07121-1701: PMP Gantt Chart with Milestones See uploaded file for details: “07121-1701 – Baseline Project Management Plan – 4 Mar 09.mpp Note: Hours are approximate, since budget process used estimated hourly costs

  8. Clarifications on Project Scope & Hours • Project hours are approximate – based on estimated hourly labor & overhead costs. • Project scope will include data collection on all Deepwater & Ultra-Deepwater potential targets for IOR, including: - currently producing fields. - planned developments. - Paleogene horizons. • Project scope will be based on a broad definition of Improved Oil Recovery processes – including well & facility processes which can increase Ultimate Recovery in addition to reservoir processes.

  9. RPSEA 07121-1701 – PMP Planned Expenditure Schedule See uploaded file: “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

  10. RPSEA 07121-1701 – PMP Planned Expenditure Schedule See uploaded file: “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

  11. Communication & Interface Management Plan • Open Information Flow – Anyone can communicate with anyone else, • for information. • Instructions, requests, etc go through Single Points of Contacts • (Dave Crossley, Art Schroeder) Dave Rees Wiley Wells Contract communications KR Staff Dave Crossley Art Schroeder RPSEA Dan Rao LSU Staff PWC, TAC & Champions Frank Lim APC Staff • All Official Communication (Reports, Change Requests, Etc) done in writing, • through RPSEA Sharepoint system • Nothing Confidential to be put on Sharepoint system

  12. Technology Transfer Plan • Interim Reports at Milestones & Comprehensive Final Report • Knowledge Base – Access to all study materials • Participation in RPSEA conference booths, etc. • Roadshow for interested parties Tentatively July 2010 • KR, LSU & APC present paper(s) at conferences Tentatively SPE/DOE IOR Conf, Tulsa – Apr 2010 Tentatively OTC, Houston – May 2010

More Related