1 / 1

Table based on assessment of physics needs for first year of operations.

Proposed NSTX-U operationa l g oals are to: operate at full forces (I P I P , I P B T , B T B T ) in 2 years , full coil heating in 3 rd year. Table based on assessment of physics needs for first year of operations.

joella
Download Presentation

Table based on assessment of physics needs for first year of operations.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed NSTX-U operational goals are to: operate at full forces (IPIP, IPBT, BTBT) in 2 years, full coil heating in 3rd year • Table based on assessment of physics needs for first year of operations. • 1st year goal: operating points with forces 1/2 the way between NSTX and NSTX-U, ½ the design-point heating of any coil: • OH FZ apparently requires full influence matrices for essentially ANY operations. • 2nd year goal: full field and current, but still limiting the coil heating. • Of course, will revisit year 2 parameters once year 1 data has been accumulated. • 3rd year goal: full capability

More Related