400 KV D/C GAZUWAKA-NUNNA LINE. COMMISSIONING AND ADVANTAGES. COMMISSIONING HIGHLIGHTS. GAZUWAKA-NUNNA-II CHARGED FROM GAZUWAKA END AT 1626 ON 26/02/05 AND SYNCHRONISED AT NUNNA AT 1652 HRS GAZUWAKA-NUNNA-III CHARGED FROM GAZUWAKA END AT 2303 ON 27/02/05 AND SYNCHRONISED AT NUNNA AT 2315 HRS.
E N D
400 KV D/C GAZUWAKA-NUNNA LINE COMMISSIONING AND ADVANTAGES
COMMISSIONING HIGHLIGHTS • GAZUWAKA-NUNNA-II CHARGED FROM GAZUWAKA END AT 1626 ON 26/02/05 AND SYNCHRONISED AT NUNNA AT 1652 HRS • GAZUWAKA-NUNNA-III CHARGED FROM GAZUWAKA END AT 2303 ON 27/02/05 AND SYNCHRONISED AT NUNNA AT 2315 HRS
ADVANTAGES OF THE LINE • PLANNED FOR EVACUATION OF POWER FROM POLE 2 AT GAZUWAKA • ALLEVIATED THE LOADING AND LOAD ANGLE ON THE S/C 400 KV GAZUWAKA-NUNNA LINE • IMPROVED THE EVACUATION OF SIMHADRI AS WELL AS GAZUWAKA IMPORT • LOSSES REDUCED BY 8 MW WITH FULL GENERATION AT SIMHADRI AND 500 MW IMPORT AT GAZUWAKA • IMPROVED STABILITY IN N.COASTAL AP AREA • RELIEVED LOADINGS ON GAZUWAKA-KAKINADA-VTS CORRIDOR