An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Communication campaign FinancialReporting: Formalities & General Aspects, CommonMistakes & E-reportingBasics Nora Ovcharova FCH JU Financial Officer

  2. The FORCE Form C • The tool used to report/declare costs incurred and to claim the requested FCH JU contribution • 1 per participant & per reporting period • Filled in by each participant & submitted electronically via the Participant Portal/Force and as signed paper to the coordinator • Pre-populatedbyreimbursementrate, PIC, ICM per entity & linked to the Use of Resources (UoR) section • Submitted both electronically (and physically* for Calls 2008-2011 - signed originals if paper submission versus e-submission) to the FCH JU by the coordinator

  3. The Form C • Pre-populated fields • Data concerning project, participant No, PIC & reporting period comes automatically. • - Normal orAdjustmentForm C comes as DROP - DOWN menu Fields to be completed - Upon clicking on a {Direct Cost cell}, the USE OF RESOURCES dialog box appears asking for details about the costs incurred (asking for WP, cost type and units, amount & explanation on the cost.) The REQUESTED FCH Contribution Comes automatically as the MAX allowable contribution MODIFY as needed !! 3

  4. Use of Resources Pop-up Screen – pls enter costs & details per WP, unit of measure, equipment and depreciation method, consumables details of item above 500 EU, travel details. Detailed cost breakdown - details help FCH decide on eligibility & acceptability of costs, save clarification delays, & facilitate payment.

  5. Form C Formalities • Do not forget to declare the respective receipts & interest.! • Do not forget to specify if Average personnel costsused – based on : • CoM (Certificate on methodology (Form E) or CoMAV(Certificate on Methodology for Average personnel costs), or • by meeting the respective 4 cumulative criteria as per Art.II.14.1. • Ensure that the Form C is signed by the Authorised Representative (AR) / E-sign, or enclose a delegation letter if signed by another person. • Date and stamp the Form C. • Justify missing stamp- If no stamp used in normal business operations • 5

  6. Common Issues of Costs eligibility Rule: Costs claimed should be based on Actual costs incurred: • Supported by proper documentation - auditable / to be kept 5 years after end of project • Used for the sole purpose of achieving the objectives of the specific project ONLY – • NOTbudgeted or estimated rounded amounts – to be actual costs, at min. based on the latest information available, and later adjusted based on real costs. • Average personnel costs – based on 1) CoM (Certificate on Methodology) or CoMAV (CoM for Average Pers. costs), or 2) compliance with Art. II.14 criteria, then adj. next period… • Incurred during the reporting period – or pro-rated for the reporting period. • VAT shall be excluded from all costs, depreciation rules to be followed. • In accordance with usual accounting and management principles • Incurred by and Recorded in the accounts of beneficiary • Used for the sole purpose of achieving the objectives of the project • In a nutshell shall be eligible - ...........

  7. USE of RESOURCES (UoR) DETAILS REQUIRED DETAILED explanation per COST TYPE strongly recommended to help FCH analysis, speed up processing & payment, avoid clarification requests/ delays. Personnel costs: Employee category, Person/Month, Hours spent in the project / cost claim / per WP and employee, an example: WP2 / Engineer-1 / 2,3 PM / 322 hours / 6765.40 EUR Travel costs: Purpose / destination / number of persons travelling / dates / cost claim / per WP and travel, example: WP1 / Kick-off meeting / London / from 13.05.2013 to 14.05.2013 / 684.00 EUR Consumables: They should be itemised and described – to ensure consumables and no equipment hidden. Descriptions like “consumables – 5800.00 Euro, or “Different consumables” should be avoided Durable Equipment Unit & Description / Price excl. VAT / Purchase date / Useful life/ % Use - Depreciation as per FCH rules Example: 1 PC / 800 EUR / 12.9.2012 / 3 years / 100% / 350 EUR divided for the 2 or 3 reporting periods 7

  8. Costs not Foreseen in GA • Costs declared NOT planned : • either not planned at all, or • not mentioned under the specific type of Activity, • or type of Cost not planned – e.g. sub-contracting! • Slide 8

  9. Costs NOT Foreseen in GA Costs declared NOT foreseen in the GA – e.g NOT planned at all - MNGT costs of beneficiary 2, - or subcontractors should have been identified in the DoW / Annex I of FCH JU GA. If not foreseen, a solid proper Justification should be provided to allow FCH Judge IF indeed costs needed & eligible/acceptable. 9

  10. Costs NOT Related to the Specific Project Budgeted & Reported seemingly OK, but at reviewing the UoR we find costs not related to the project – Procurement course

  11. Useof Resources New Pop-up Screen – pls enter costs & details as per WP, unit of measure, equipment and depreciation method, consumables, travels

  12. Costs not Sufficiently Substantiated Missing Details We cannot decide on the eligibility costs so clarifications requested: • Personnel – Man/months per WP? • Travel & Subsistence - estimates, or actual costs incurred & accounted for? • Procurement Course & Coordinator’s workshop - are these project-related ? • Consumables Details + Actuals/Estimate? • Depreciationmethod on Equipment? • VAT/ Discounts on purchases deducted? • Wrong detail – CFS, or Annual audit roject

  13. VAT, OtherTaxes & Discounts • VAT & taxes may be present in direct costs, sub-contracting, ODC, IC … • VAT is usually considered as a cost by the beneficiary’s accounting • VAT, whether recoverable or not, is ineligible for FCH claims. • Please ensure that VAT is always excluded from all FCH /FP7 cost claims • VAT is often forgotten in small purchases – tickets, logistics, consumables • Discounts to be treated similarly – when granted, they shall be deducted.

  14. Reporting example

  15. USE of Resources

  16. Errors observed -Clarifications • Personnel, ODC & indirect costs seem the most common Clarifications topics • Different from the official one start date – costs shall be incurred during Reporting period (s) as defined by GA to be eligible • Different reporting period – 20 months instead of 18 – please pro-rate ! • Different treatment of the same costs – consultants to be treated as personnel, or sub-contracting, or eventually as a TP / beneficiary/SME? • Wrong reporting under previous periods – clarified & adjustments done. • IC reported at 20% of DC in case of Actual ICM – Hardly possible to be actual ! • Travel & subsistence reported as Direct costs – not directly project related - IC pool

  17. Interest and Receipts • Bank Interest shall be reported by the Coordinator only – for funds not distributed to partners ( not for the COO’s own share) as the interest on own funds generally belongs to the beneficiaries. • Interest and receipts revisited at final payment to make sure non-profit rule observed – i.e the FCH Contribution + interest received (treated as receipt for FCH) + receipts shall not exceed 100% total costs – FCH + receipts + Interest < than 100% total costs accepted. • Bank charges for Bank Guarantee for the FCH project + charges for special trust accounts are eligible costs to be reported. • CFS auditors’ fees are eligible costs – we encourage you to report these under MNGT sub-contracting

  18. Preparing for E-Reporting • In the beginning of the project Nomination of Financial Statement Authorised Signatory(FSIGN): ex AR for paper submissions, i.e. the person(s) authorised to sign Forms C electronically • First step: Identification / Nomination of a LEAR • FSIGNs nominated by the Legal Entity Appointed Representative (LEAR), • online directly in the identity and access management (IAM) of the Participant Portalportal. • => The nomination of a LEAR for each participating organisation becomes mandatory. • Second step: LEAR nominates the FSIGNs • LEARs can register as many FSIGNs as needed for their organisation • Nominations are made in the role management screen under "My organisations". • Third step: Participant Contact chooses the FSIGN for the project • One of the participant/coordinator contacts chooses one or more FSIGNs for the project from the list nominated by the LEAR. • This is done in the role management screen of the project.

  19. E-reporting 2. When Report Due • Form C • financial data introduced in the financial reporting module, • Form C is identified as "ready for signature" (instead of submitted directly to the coordinator) • Notification to FSIGN who signs it electronically and transmits it to the coordinator. • If no FSIGN yet assigned to the project, the system alerts & provides instructions on steps to take. • Certificates on financial statements (CFS), • scanned & uploaded with the Form C before the form is identified as "ready for signature". • The original of the CFS (signed by the certifying auditor) must be kept in the files of the beneficiary and available in case of audit (no longer sent in paper to the FCH JU). • Third parties (Special clause 11) • A separate Form C • to be completed in the financial reporting module and transmitted by the beneficiary to the coordinator (without electronic signature). • After the coordinator transmitted the whole package to the FCH JU, the Form C of the third party must be printed and hand-signed by an authorised representative of the third party. • must be kept in the files of the beneficiary (no sending to the FCH JU).

  20. Errors of CFSs (Form D) • AIM: To provide Assurance on the eligibility and validity of the Costs claimed at FCH cumulative interim costs ≥ 325K Euro, or final uncovered claims ≥ 50K • Errors : Wrong Format – Form E (on methodology) instead of Form D, EU format • Prevailing error - Incomplete CFS (package does not include all 3 required parts) - 1) Counter-signed by you and auditor ToR, 2) Independent Report on Factual Findings , 3) Table of Procedures with results and explanations where N/A, + copies of validated FORM Cs annotated by CFS auditor– …rejected for correction and resubmission. • ToR not signed – or not co-signed by both Beneficiary and Auditor • Difference in wording / format / language. NB Standard ENG CFS is mandatory. • Table of procedures – results of procedures not indicated, N/A not explained, not specified b/n the options for ICM validation • Discrepancies between costs declared by beneficiary & certified by Auditor, receipts declared and certified, RoE comment, interest reported & declared – reject ? • Exceptions reported not further investigated and quantified, prior periods/ audits • Ineligible VAT & other Taxes identified – to be rejected.