Analysis of MDSS Benefits and Costs David Huft, South Dakota DOT MDSS Stakeholders Meeting #8 Falls Church, VA August

Analysis of MDSS Benefits and Costs David Huft, South Dakota DOT MDSS Stakeholders Meeting #8 Falls Church, VA August 10, 2006. Connecting South Dakota and the Nation. Pooled Fund Study TPF-5(054) Project Partners. Colorado DOT Indiana DOT Iowa DOT Kansas DOT Minnesota DOT

joey
Download Presentation

Analysis of MDSS Benefits and Costs David Huft, South Dakota DOT MDSS Stakeholders Meeting #8 Falls Church, VA August

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis of MDSSBenefits and CostsDavid Huft, South Dakota DOTMDSS Stakeholders Meeting #8 Falls Church, VA August 10, 2006 Connecting South Dakota and the Nation

  2. Pooled Fund StudyTPF-5(054) Project Partners • Colorado DOT • Indiana DOT • Iowa DOT • Kansas DOT • Minnesota DOT • New Hampshire DOT • North Dakota DOT • South Dakota DOT(lead state) • Wyoming DOT • Federal Highway Administration • Meridian Environmental Technology

  3. Safety User costs Work hours Material use Equipment use Environmental impact ? Software Instrumentation Data processing Training Management ? Potential Benefits & Costs

  4. Study Objectives • Describe the essential functions of a winter MDSS. • Describe the resources needed to supply the essential functions of an MDSS. • Characterize and estimate the costs of deploying MDSS in state transportation departments. • Characterize and estimate the benefits of deploying MDSS in state transportation departments.

  5. Study Tasks • Meet with project’s technical panel • Interview stakeholders, identify: • identify objectives for MDSS deployment • potential costs and benefits • data sources for formal benefit/cost analysis • Define a detailed analysis methodology • Estimate tangible benefits and costs of MDSS deployment alternatives evaluate the risk • Characterize intangible benefits and costs

  6. Study Tasks • Report findings, conclusions, and recommendations to the project’stechnical panel. • Develop outreach materials suitable for distribution to elected officials and state DOT decision makers • Prepare a final report of research methodology, findings, conclusions and recommendations. • Make an executive presentation to the project’s technical panel and provide electronic copies

  7. Pooled Fund StudyTimeline (simplified) Assess States’ Needs, Readiness 2002 Evaluate Functional Prototype 2003 Develop MDSS Software 6-State Limited Deployment 2004 Refine Pooled Fund MDSS Validation Studies 2005 8-State Field Trials 2006 Extensive Deployment B/C Analysis 2007 Full Deployment

  8. For More Information: Contact David L. Huft SDDOT Office of Research 700 East Broadway Pierre, SD 57501-2586 Phone: 605.773.3358 Fax: 605.773.4713 dave.huft@state.sd.us