Automation Routes Briefing. Matt Maki Jerry Smith Andria Roney Don Schraub. Automation Routes Findings. Data Comm DCL Trials have found many FAA mandated routes in NAS are not loadable
E N D
Automation Routes Briefing Matt Maki Jerry Smith Andria Roney Don Schraub
Automation Routes Findings • Data Comm DCL Trials have found many FAA mandated routes in NAS are not loadable • A review of ERAM adaptation and flight plan data revealed a significant number of other non-loadable routes • Identified ~6160 non-loadable facility adapted routes • ADRs, ADARs, AARs, APRs , etc. • Approximately ~7000 nationally published routes • CDRs, Playbook Routes, IFR Pref. Routes • Adapted routes containing Non-Loadable elements • Airway to Airway no named intersection - ~ 686 • (KIAH) .AEX6..MCB..MEI..MGM..AJFEB..GRD..J209..J207..FKN..J79..JFK..HTO..KPVD • Radials flown as a route element. ~1500 • (KSLC)..TCH.TCH094..MTU303.MTU..HBU • 3 Letter Identifiers being utilized as origin and destination airports • Airports , CDR’s • ZNY Automation / Controller Entry • Fake or Ghost Intersections • Computer assigned • AOC’s insert to make loadable today, some FMC’s have capability, not all. • Coding that allows Airport to Airway intercepts ~387 • KMEM J42 BKW J147 CSN OTT6 KBWI • NAT Tracks, XXX
Automation Routes • 5 Element Strategy for Success Education in the field • Automation Departments / POFM’s • Airspace Managers • AOC/GOC Airline Partners • Command Center • Air Space Design Groups • OAPM need to discuss rules ahead of • PBN fall planned meeting • Briefings include invites to: • POFMs and their associated staffs • Airspace Manager and their associated staffs • TMU Manager and their associated staffs • Internal ARTCC Tower management • Chad Geyer National NATCA representative coordinates with Article 48 members and Tower Union Representatives
Automation Routes Briefing Schedule To date • Communication / Coordination / Follow Up • Chart Updates • – occur every 56 days • – re-analyze data and TELCON follow up with sites previously visited • FAA Status – Weekly meetings and monthly PMRs • Data Comm Implementation Team (DCIT) Feedback • – collect and report fixes being put into place