1 / 5

Solve Your Problems By Using Our Online CIS-PPM Dumps Study Material

Are you as well one of the specialists aiming to improve IT proficiencies? So therefore, becoming certified with CIS-Project Portfolio Management certification is a worthy pick to commence. Coincidently, you could purchase the Online CIS-PPM Practice Questions and begin training to comply with that aim. The Pass4sure ServiceNow Practice Test Question Answers delivers lots of openings to obtain advanced proficiencies plus move forward in the profession. Qualifying the Certified Implementation Specialist - Project Portfolio Management (PPM) exam is your opening to achieve that also. Nonetheless,

johndewey
Download Presentation

Solve Your Problems By Using Our Online CIS-PPM Dumps Study Material

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ServiceNow ServiceNow CIS-PPM DUMPS PDF Certified Implementation Specialist - Project Portfolio Management (PPM) Certified Implementation Specialist - Project Portfolio Management Verified By Experts Verified By Experts Get Prepared And Pass Your Get Prepared And Pass Your Teach Teach Yoursel Yoursel

  2. Practice Test ServiceNow - CIS-PPM Question #:1 The PPM Standard plugin enables an it_project_manager to perform the following activities: (Choose three.) A. Determine overall project cost requirements B. Configure cost type definition C. Define target for the portfolio D. Establish resource requirements and track costs. E. Track actual amount spent compared to an approved budget. Answer: A D E Question #:2 When can a user choose from multiple rate types for their work, while logging a time card? A. Only if the capability is enabled in the Project Preferences B. Only if this capability is enabled in the Project Record C. Only one (1) rate type can apply D. Only if the capability is enabled in the Time Sheet Policies Answer: D Question #:3 Where can a user export project data in either a MPP, XML or CSV format? A. Demand Form B. Related lists C. Project Workbench D. Planning Console Answer: D 1 of 4

  3. Practice Test ServiceNow - CIS-PPM Question #:4 The hourly rate is derived from the resource rate on the resource plan, if this option is selected. A. Rate override B. Labor rate card C. Rate model D. Planned cost Answer: C Question #:5 In which table can you find cost information for a specific fiscal period? A. cost_plan B. expense_line C. cost_plan_breakdown D. pm_project Answer: C Question #:6 At a minimum, which role is required to view the summary of a project in the Details tab of Project Workspace? A. it_project_manager B. itil C. it_project_user D. it_portfolio_manager Answer: C Question #:7 2 of 4

  4. Practice Test ServiceNow - CIS-PPM To use the Time Sheet dashboard, what plugin must be installed? A. Common ITSM Service Portal Application Components (com.snc.app_common.service_portal) B. Employee Service Center (com.sn_hr_service_portal) C. Knowledge Management – Service Portal (com.snc.knowledge_serviceportal) D. Performance Analytics – Content Pack – PPM Standard plugin (com.snc.pa.pmo_dashboards) Answer: D Question #:8 What role can configure an idea module, map idea categories to the idea module, and add navigation for the Idea Portal? A. Idea admin [idea_admin] B. Project manager [it_project_manager] C. Idea manager [idea_manager] D. Demand manager [it_demand_manager] Answer: A Question #:9 Which of the following roles can access the project administration application? A. it_project_user. B. it_pps_admin. C. it_project_manager. D. timecard_admin. Answer: B Question #:10 How is a resource group’s capacity derived for resource planning? A. 3 of 4

  5. Practice Test ServiceNow - CIS-PPM A. Aggregate capacity of all its members. B. Stored in Resource_Aggregate_Daily table. C. Stored with Group Record. D. Stored in Resource_Allocation_Daily table. Answer: A https://www.dumpspass4sure.com/ https://www.dumpspass4sure.com/ 4 of 4

More Related