Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria-Government Ministria e Zhvillimit Ekonomik / Ministry of Economic Development. High Level Forum “Security of Electricity Supply in Kosovo” energy policy Framework in Kosovo Luan Morina, Head of Department for Energy
E N D
Republika e KosovësRepublika Kosova-Republic of KosovoQeveria-GovernmentMinistria e Zhvillimit Ekonomik/Ministry of Economic Development High Level Forum “Security of Electricity Supply in Kosovo” energy policy Framework in Kosovo Luan Morina, Head of Department for Energy Prishtina, March,01,2016
Main Energy Stakeholders • Ministry of Economic Development – responsible for energy policies; Energy strategy, National Plan for Renewables, National plan for EE and legislation framework • Energy Regulatory Office – responsible for regulatory issues; licensing, tariffs, authorization • KEK – responsible for Electricity generation- state own company • KOSTT – responsible for transmission network; state own company; operates with lines 110kV, 220kV, 400kV • KEDS – responsible for Distribution network; private company; operates with lines 35kv and below • KESCO – responsible for energy supply; private company
Energy Supply in Kosovo between 2014- 2015 • Energy – Electricity Production in Kosovo is based in two thermo power plants based on Coal: • TC Kosovo A / installed capacity 800 MW – electricity production in 2014 : 1432 GWh (1,905,371 in 2015) • TC Kosova B/ installed capacity 678MW –electricity production in 2014: 3310 GWh (3,556,996 in 2015) • Small Hydro power plants: • HC Ujman /installed capacity 35MW; electricity production in 2014 : 103,3 GWh (101,5 GWh in 2015) • HC Distributive (Lumbardhi , Dikance, Radavc and Burim)/installed capacities 10.84Mw; electricity production in 2014 : 36.1 GWh (49.4 GWh in 2015) • Imports : in 2014/ 932GWh and in 2015 / 648 302 MWh • Export: in 2014 /452GWh and in 2015 / 552 520 MWh
TC Kosovo A • TC Kosovo A / installed capacity 800 MW – electricity production in 2014 : 1432 GWh • Decommissioning of TC Kosovo A it is foreseen to be in 2017 • Working group are established and they are working based on the decision of the Government of Kosovo for decommissioning of Kosovo A, starting with fertilizer facilities, gasification and heat plant, as the first stage of this process; • For a purpose of security of supply, need to be taken into consideration as well extending the work of TC Kosovo A till we have new generation capacities in place.
TC Kosova B - Existing power plants to comply with ECT requirements • In TC Kosovo B need to be implement environmental measures based on the requirement of Directives IED • Two studies in the process: • Study for identification of measures which need to be implemented ; financed from EU, through IPA 2014 • Study for financing modalities for the implementation of recommended measures; financed from USAID – the draft is already presented to the MED and other energy stackholders
Renewable Energy Potential in Kosovo • Energy from SHPP– identification of 77 locations with an installed capacity of 128,197 MW ( studies ) • Wind Energy– Actual assessments have identified about 250 MW installed capacity (KfW- wind atlas) • Solar Energy– annual assessment of the potential: between 1500 and 1650 kW/m²/year • Energy from Biomass (fire wood)- potential for annual logging of wood is estimated to be 0.9 mil. m³, for energy needs . • Geothermal Energy- there are no details assumptions
Renewable energy framework in Kosovo • National target in RES - 25 % Obligatory - 29.47 % Indicatory • National Renewable Energy Action Plan 2011-2020 • Legislation framework on RES • AI no.01/2013 on Renewable Energy Targets • AI no. 2/2013 for promotion of using RES • Support Scheme for RES – already in place
Legislation framework on RES • Directive 2009/28/EC on Renewable Energy Sources (RES) • Share of Renewable Energy Target in gross final energy consumption by 2020 • Calculation of RES target : RESin electricity +RES heating and cooling +RES in transport Gross final energy consumption
AI No.01/2013 ON RES TARGETS-T Biofuels for transport are under the responsibly of the Ministry of Trade and Industry • Target of 10%, or 36,33 ktoe • Domestic Production of the Biofuels will become after 2018, • Renewable Energy Consumption in Transport will be 2,1 % of Gross Fuel Energy Consumption
Energy Regulatory Office – ERO Responsibilities on RES Feed-in tariffs Energy Regulatory Office - ERO according to the basic energy laws is responsible for Feed-in tariffs and authorization procedures RES: (€/MWh) • HPP (<10MW) 63.3 • Wind 85.0 • Solid biomass 71.3 • Photovoltaic 136.4
Challenges in Kosovo for RES • Increasing the interest for real investments in energy generation based on the RES – financial difficulties • Involving Small and Medium Enterprises in the process of producing (elements) renewable technologies • Maximization of RES energy production taken into consideration the level of economic development in Kosovo • Establishing One Stop Shop for RES
Energy Efficiency in Kosovo • Kosovo target is 9% , or 92Ktoe to be achieve in 2018 • Based on the target is developed Kosovo Action Plan for EE 2010-2018 • Implementation of EE measures is focused in the consumption site , according to the directive 2006/32/EC • Legislation framework in place; Law on no. 04/L-116 Energy Efficiency is developed based on the relevant directives : • Directive 2006/32/EC • Directive 2010/30/EC • Directive 2010/31/EC
Challenges in Kosovo for Energy Efficiency • Law on Energy Efficiency need to be revised based on the directive 2012/27/EC – it is in the finale stage • Energy Efficiency fund need to be established in order to create a financing scheme not only for public building but as well for SME and Household sector. • Energy Efficiency target is going to be increase after 2018 – in the minister council level within ECT further commitment are done towards implementation of Energy Efficiency measures
Strategic approach to achieve SoS Peak demand forecast between 2016 -2024 Current power operation capacities: TPP= 825MW ( 260 x2 + 135 x3) HPP = 48 MW
Strategic approach to achieve SoS Energy demand forecast between 2016 -2024 In 2015 the total energy consumption it was 5580GWh (preliminary data)
Strategic approach to achieve SoS Strategic approach to achieve SoS, will be based on: • National development strategy • Electricity availability and reliability is the engine of the economy • Stimulate economic growth in business sector, boost employment • Generation capacities - Basic load - in coal/ lignite • Rehabilitation of current generation capacities • Building new generation capacity – TC Kosova e re
Strategic approach to achieve SoS • Achieving target for Renewable energy sources • Introducing generation capacities based on RES • Energy Efficiency – further commitment , taken into consideration directive 2012/27/EC • EE measures in consumption and generation side • Diversification of energy generation sources, taken into consideration as well developing gas sector for industry and households sector and new thermal energy systems.
Strategic approach to achieve SoS • Full commitment to international obligations; working towards full integration, opening energy market , and as well • Taken into consideration low economic development and implementation timeframe - without social hardship – gradual approach – planned transition